My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2023-044/approving award of a contract to D&S Concrete Contractors LLC for the Midtown Drainage Improvements Phase 1A project (including add alt 2) in the amount of $2,182,211.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2023
>
Res 2023-044/approving award of a contract to D&S Concrete Contractors LLC for the Midtown Drainage Improvements Phase 1A project (including add alt 2) in the amount of $2,182,211.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2023 11:28:47 PM
Creation date
3/7/2023 11:03:57 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2023-044
Date
2/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PLOTTED BY JUSTIN 1101 DER 122212022 10;21 AM <br /> DWG NAME CAUSERSQRHOLICITY OF SAN MARC=P&DS CDBG-DR MIT DOCUMEN rS=BG-DMINFRASTRUCTURE PROJECTSGDBG-NFRA-AUIOCAMMIDI OWN-CAMMIDTOWN PROJECT' <br /> COMPONENTS DWG <br /> LAST SAVED 12122/2022 10:21 AM kq� <br /> AN <br /> 'A <br /> INTERSECTION <br /> EME J w E <br /> S <br /> a gg0 2o <br /> SO' <br /> 500, <br /> GRAPHIC SCALE I"=250 <br /> // <br /> "U, <br /> pe <br /> A <br /> ffllbp <br /> S <br /> al <br /> "N <br /> am, <br /> DRAINAGE IMPROVEMENTS: <br /> EXISTING CHANNEL R <br /> RING AND GRUADDRESSES FLOODING ISSUES WITHIN <br /> 4 NEIGHBORHOOD. '72, <br /> ALLEVIATES POINDING IN MAJOR CITY <br /> INTERSECTION AND THOROUGHFARE. <br /> IMPROVES NEEDED CONVEYANCE IN <br /> REGIONAL CHANNEL FOR MAJOR STORM <br /> .......... <br /> JEVENTS. <br /> A <br /> / <br /> A/ <br /> ADDS STORMWATER DETENTION AT A <br /> REGIONAL LEVEL. <br /> HELPS STABILIZE BANK FROM EROSION <br /> "d <br /> ALONG BLANCO RIVER. <br /> "MU, <br /> /V <br /> FUNDING SOURCES: <br /> a <br /> 6 <br /> 5, CDBG DR <br /> A, CITY STORMWATER <br /> larl <br /> ESTIMATED HOMES RECEIVING BENEFIT:82 <br /> 101, <br /> Me <br /> SlIffilly <br /> r <br /> MEN= DETENTION POND <br /> REGRADE AND RESURFACE <br /> 4A, <br /> O CLEARING AND GRUBBING <br /> All <br /> ANCO RIVER <br /> DATE:NOV 2022 <br /> MIDTOWN DRAINAGE No. BY DATE <br /> DESCRIPTION <br /> DESIGNED BY:JRH <br /> DRAWN BY;JRH IMPROVEMENTS rwt <br /> SHEET No. <br /> EXHIBIT PROJECT COMPONENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.