Laserfiche WebLink
PLOTTED BY JUSTIN 1101 DER 122212022 10;21 AM <br /> DWG NAME CAUSERSQRHOLICITY OF SAN MARC=P&DS CDBG-DR MIT DOCUMEN rS=BG-DMINFRASTRUCTURE PROJECTSGDBG-NFRA-AUIOCAMMIDI OWN-CAMMIDTOWN PROJECT' <br /> COMPONENTS DWG <br /> LAST SAVED 12122/2022 10:21 AM kq� <br /> AN <br /> 'A <br /> INTERSECTION <br /> EME J w E <br /> S <br /> a gg0 2o <br /> SO' <br /> 500, <br /> GRAPHIC SCALE I"=250 <br /> // <br /> "U, <br /> pe <br /> A <br /> ffllbp <br /> S <br /> al <br /> "N <br /> am, <br /> DRAINAGE IMPROVEMENTS: <br /> EXISTING CHANNEL R <br /> RING AND GRUADDRESSES FLOODING ISSUES WITHIN <br /> 4 NEIGHBORHOOD. '72, <br /> ALLEVIATES POINDING IN MAJOR CITY <br /> INTERSECTION AND THOROUGHFARE. <br /> IMPROVES NEEDED CONVEYANCE IN <br /> REGIONAL CHANNEL FOR MAJOR STORM <br /> .......... <br /> JEVENTS. <br /> A <br /> / <br /> A/ <br /> ADDS STORMWATER DETENTION AT A <br /> REGIONAL LEVEL. <br /> HELPS STABILIZE BANK FROM EROSION <br /> "d <br /> ALONG BLANCO RIVER. <br /> "MU, <br /> /V <br /> FUNDING SOURCES: <br /> a <br /> 6 <br /> 5, CDBG DR <br /> A, CITY STORMWATER <br /> larl <br /> ESTIMATED HOMES RECEIVING BENEFIT:82 <br /> 101, <br /> Me <br /> SlIffilly <br /> r <br /> MEN= DETENTION POND <br /> REGRADE AND RESURFACE <br /> 4A, <br /> O CLEARING AND GRUBBING <br /> All <br /> ANCO RIVER <br /> DATE:NOV 2022 <br /> MIDTOWN DRAINAGE No. BY DATE <br /> DESCRIPTION <br /> DESIGNED BY:JRH <br /> DRAWN BY;JRH IMPROVEMENTS rwt <br /> SHEET No. <br /> EXHIBIT PROJECT COMPONENTS <br />