My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2023-048/approving a Change in Service to the Highway 80 Utility Project agreement with Freese and Nichols, Inc. related to design of 15,700 additional linear feet of reclaimed water main from city’s wastewater treatment
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2023
>
Res 2023-048/approving a Change in Service to the Highway 80 Utility Project agreement with Freese and Nichols, Inc. related to design of 15,700 additional linear feet of reclaimed water main from city’s wastewater treatment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2023 1:32:26 PM
Creation date
4/12/2023 4:13:10 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2023-48
Date
3/7/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Bid Package No. 2- Lift Station, Force Main, Reclaimed Water Main,and Water Line—Lift station <br /> and appurtenant work,force main and reclaimed water main from the connection to the Blanco <br /> Riverine Expedited Package to the lift station,and water line from CRWA plant to Old Bastrop <br /> Road. <br /> Supplemental services include effort to create two separate plan sets/contract documents and <br /> provide Blanco Riverine Expedited Package design,construction,and record drawing phase services. <br /> Bid and construction phase services for Bid Package No. 2 are included in Basic Services. <br /> ARTICLE IV <br /> ADDITIONAL SERVICES: No changes. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.