My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2023-174R awarding a construction contract to Santa Clara Construction, LTD., for the Sunset Acres Neighborhood Improvement, Phase 1 project in the estimated amount of $1,642,910.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2023
>
Res 2023-174R awarding a construction contract to Santa Clara Construction, LTD., for the Sunset Acres Neighborhood Improvement, Phase 1 project in the estimated amount of $1,642,910.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/1/2024 4:53:03 PM
Creation date
11/21/2023 11:23:47 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2023-174R
Date
11/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PLUMMER <br /> AW <br /> October 5, 2023 <br /> Via Electronic Mail <br /> Mr. Rohit Vij <br /> Senior Engineer <br /> City of San Marcos <br /> 630 E. Hopkins <br /> San Marcos,TX 78666 <br /> Re: Recommendation Letter <br /> IFB 223-246:Sunset Acres Neighborhood Improvements, Phase 1 <br /> Dear Mr.Vij: <br /> A total of 5 bids were received for the Sunset Acres Neighborhood Improvements, Phase 1 on <br /> September 14, 2023.A copy of the bid tabulation and bid item breakdown is enclosed in Attachment A. <br /> The apparent low bidder for the above referenced project is Cedar Hills Construction, LLC, with a bid <br /> amount of$1,612,196.00. <br /> Ranking` Bidder . „1 ,., . , %; .. BiiTotai; , <br /> 1 Cedar Hills Construction, LLC $1,612,196.00 <br /> 2 Santa Clara Construction, Ltd. $1,642,910.00 <br /> 3 Cash Construction Co. $1,760,777.50 <br /> 4 MA Smith Contracting Co. $2,106,793.00 <br /> 5 Aaron Concrete Contractors, LP $2,666,321.00 <br /> However, item 16 of the Statement of Bidder's Qualifications and Assurances in the Project Manual <br /> require that the Contractor submit proof of five projects performed within the past five years involving <br /> wastewater line replacement with a cost in excess of$1,000,000; in reviewing the bid package <br /> submitted by Cedar Hills Construction, City of San Marcos and Plummer personnel have noted that only <br /> three such projects were included. Per paragraph 5(k)of the Instructions to Bidders,the City may reject <br /> bids that do not meet the minimum experience qualifications shown above.Therefore, Plummer <br /> recommends rejecting the bid submitted by Cedar Hills Construction and selecting the second-lowest <br /> bidder, Santa Clara Construction, Ltd.,with a bid of$1,642,910.00. <br /> Based on their Statement of Qualifications and feedback from the contractor's references, Santa Clara <br /> Construction, Ltd. appears to be qualified and capable of performing the work for this project. Per this <br /> information and the Purchasing Manager's assessment of responsiveness of the Bidder, Plummer <br /> recommends that the City of San Marcos award the construction contract for this project to Santa Clara <br /> Construction, Ltd.,for a total bid amount of$1,642,910.00. <br /> 6300 La Calma Drive,Suite 400 <br /> Austin,TX 78752 <br /> Phone 512.452.5905 <br /> Plummer.com <br /> TBPE Firm No.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.