Laserfiche WebLink
EXHIBIT 4 <br /> AUTHORIZATION OF CHANGE IN SERVICE <br /> AGREEMENT/SERVICES NAME: 219-113 Linda Drive Improvements <br /> CITY REPRESENTATIVE: Kirk Abbott,P.E. <br /> CONTRACTOR: LNV,LLC. <br /> CONTRACT EFFECTIVE DATE: May 28,2019 <br /> THIS AUTHORIZATION DATE: November 7,2023 AUTHORIZATION NO.:07 <br /> DESCRIPTION OF WORK TO BE ADDED TO OR DELETED FROM SCOPE OF SERVICES: <br /> Provide electrical design services(60%through 100%Design Phase)to convert the existing overhead to <br /> underground located on Linda Drive from River Road to Rebecca Street for Phase I of Linda Drive <br /> Improvements. See attached LNV's Fee Proposal Worksheet,Attachment A and McCord Engineering,Inc. <br /> Proposal,Attachment B. <br /> Below is a summa <br /> Additional Services Amount <br /> 60%Electrical Design Phase $83,220 <br /> 90%Electrical Design Phase $53,465 <br /> 100%Electrical Design Phase $31,805 <br /> Total 1 $168,490 <br /> Original Contract Amount: NTE $911,108 <br /> Previous Increases/Decreases in Contact Amount: NTE $227,480 <br /> This Increase/Decrease in Contract Amount: NTE $168,490 <br /> Revised Contract Amount: NTE $1,307,078 <br /> CON ACTOR: <br /> 11/07/23 <br /> SignaturJ V Date <br /> Byron Sanderfer,P.E./Public Works Practice Director <br /> Print Full Name/Title(if not in individual capacity) <br /> CITY: <br /> Signature Date <br /> Print Name <br /> Title <br /> City Department Use Only Below This Line(PM,etc.). <br /> Account Number(s): <br /> # fDatel f Amount 'i <br /> fDatel jAmountj <br /> # fDatel Amount <br />