Laserfiche WebLink
CSJ #0016-02-122 <br />District # 14 <br />Code Chart 64 #37950 <br />I-35 Ramps at River Ridge <br />CFDA #20.205 <br />6. Coordination of the adjustment of utilities will be provided by the Local Government and funded in <br />accordance with 43 TAC §15.55(c). <br />7. Environmental Assessment and Mitigation will be carried out as stated in the Master Agreement, <br />without exception. <br />8. Compliance with Texas Accessibility Standards and ADA will be as stated in the Master <br />Agreement, without exception. <br />9. Architectural and Engineering Services will be provided by the State, as stated in the Master <br />Agreement, without exception. The State is responsible for performance of any required <br />architectural or preliminary engineering work. The Local Government may review and comment <br />on the work as required to accomplish the public purposes of the Local Government. The State <br />will cooperate fully with the Local Government in accomplishing these local public purposes to the <br />degree permitted by State and Federal law. <br />10. Construction Responsibilities will be carried out by the State, as stated in the Master Agreement, <br />without exception. <br />11. Project Maintenance will be undertaken as provided for in the Master Agreement, without <br />exception. <br />12. Local Project Sources and Uses of Funds <br />a. Project Cost Estimate: A Project Cost Estimate is provided in Attachment C. The State and <br />the Federal Government will not reimburse the Local Government for any work performed <br />before the issuance of a formal Letter of Authority by the Federal Highway Administration. <br />The Local Government is responsible for 100% of the cost of any work performed under its <br />direction or control before the federal Letter of Authority is formally issued. <br />If the Local Government will perform any work under this contract for which reimbursement will <br />be provided by or through the State, the Local Government must complete training before a <br />letter of authority is issued. Training is complete when at least one individual who is working <br />actively and directly on the Project successfully completes and receives a certificate for the <br />course entitled Local Government Project Procedures Qualification for the Texas Department <br />of Transportation. The Local Government shall provide the certificate of qualification to the <br />State. The individual who receives the training certificate may be an employee of the Local <br />Government or an employee of a firm that has been contracted by the Local Government to <br />perform oversight of the Project. The State in its discretion may deny reimbursement if the <br />Local Government has not designated a qualified individual to oversee the Project. <br />b. A Source of Funds estimate is also provided in Attachment C. Attachment C shows the <br />percentage and absolute dollar amount to be contributed to the project by federal, state, and <br />local sources. <br />c. The Local Government is responsible for all non-federal and non-state funding, including all <br />project cost overruns, unless otherwise provided for in this Agreement or through amendment <br />of this agreement. <br />d. Prior to the performance of any engineering review work by the State, the Local Government <br />will pay to the State the amount specified in Attachment C. At a minimum, this amount shall <br />equal the Local Government's funding share for the estimated cost of preliminary engineering <br />for the project. At least sixty (60) days prior to the date set for receipt of the construction bids, <br />AFA-LPAFA ShortGen.doc Page 2 of 9 Revised 07/10/2009