My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-078 approving an agreement with Clint Jones, owner of Fleming Farms, Highlander S M Two, Rattler Ridge, LP., and JLBC 710 Investments, LLC, owner of Sedona South, to provide for the sharing of costs for the construction
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-078 approving an agreement with Clint Jones, owner of Fleming Farms, Highlander S M Two, Rattler Ridge, LP., and JLBC 710 Investments, LLC, owner of Sedona South, to provide for the sharing of costs for the construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 4:00:55 PM
Creation date
5/21/2024 3:54:45 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-78
Date
5/7/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Station, except as otherwise provided in Section 5 below ("Offsite <br /> Improvements"). The final locations of the Offsite Improvements shall be <br /> determined by the Developers, except for those portions of the Facilities to <br /> be located within the Plant Site which shall be determined by the City. Each <br /> Developer is responsible for the acquisition of all necessary offsite <br /> easements to connect that Developer's Tract or District to the Main Lift <br /> Station. Provided, however, in the event a Developer demonstrates that it <br /> has been unable to acquire a necessary easement(s) after making reasonable <br /> offers, the City agrees to use its eminent domain powers to condemn and <br /> acquire the offsite easement(s) to allow for the Offsite Improvements to be <br /> installed. Each Developer shall reimburse the City for all related costs <br /> pertaining to acquiring such offsite easements necessary to serve such <br /> Developer's Tract. The Improvements shall be designed to the City <br /> Standards. The City will be provided access and may inspect the <br /> Improvements during construction to determine whether such <br /> Improvements meet the City Standards, in the City's sole discretion. Once <br /> the Improvements are completed, inspected, and determined to meet the <br /> City Standards, the Developers or Districts shall convey the Improvements <br /> to the City and the City shall accept the Improvements for ownership, <br /> maintenance, and operation in accordance with Regulatory Requirements. <br /> b. The Developers and Districts shall design and construct the Improvements <br /> necessary to connect to the then-existing Wastewater Collection System or <br /> the Main Lift Station in accordance with Regulatory Requirements and the <br /> City Standards. The City shall have no obligation to provide Wastewater <br /> Services to the Customers within a Developer's Tract or District until such <br /> time as such Developer or District has constructed the Improvements, in <br /> accordance with the Regulatory Requirements, necessary to connect to the <br /> City's system or the Main Lift Station in accordance with City Standards. If <br /> during its review of each Developer's plans for its Improvements the City <br /> determines that the Improvements to be constructed by such Developer <br /> should be oversized to accommodate the City's future needs to provide <br /> Wastewater Services to other customers within or outside the City's <br /> existing service area, the City, at its own cost and expense, shall pay the <br /> Developer or District such additional costs and expenses associated with <br /> oversizing such Improvements prior to such Developer's, or District's, <br /> commencement of construction of such Improvements. <br /> 5. City Review of Plans. Upon making a complete initial or updated submittal, the <br /> City's comments to Subdivision Construction Plans/Public Improvement <br /> Construction Plans ("PICPs")will be issued within thirty (30)business days. If the <br /> City fails to provide comments to such PICPs within said thirty (30) business days, <br /> such PICPs shall be deemed approved. If the Tract is located outside the City <br /> Regional Wastewater Services & Facilities Cost Sharing Agreement Res. 2024-78R <br /> Page 10 of 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.