Laserfiche WebLink
Docusign Envelope ID:21C696F2-FD37-4E21-94A2-C2BE6A22794A <br /> Exhibit 1 <br /> Scope of Work <br /> On-Call Design, Bidding, and Construction Phase Services for Sunset Acres Subdivision <br /> Sunset Acres Revised Final Design <br /> Project Background <br /> During the design phase of the Sunset Acres Improvements Project("the Project," as described in City of <br /> San Marcos Contract#218-394 and its Changes in Service#1—#6), Plummer Associates, Inc. <br /> ("Plummer") and the City of San Marcos ("City") determined that the improvements needed to be <br /> phased as follows: <br /> 1. Phase 1: Wastewater Improvements <br /> 2. Phase 2: Detention Pond Improvements <br /> 3. Phase 3: Neighborhood Improvements, Phase 1 <br /> 4. Phase 4: Neighborhood Improvements, Phase 2 <br /> In April 2024,the City received notification that it is the recipient of a United States Department of <br /> Transportation ("USDOT") grant that will allow the City to combine Phases 3 and 4 into a single phase <br /> (henceforth to be referred to as "Phase 3"), to be bid and constructed as a single project.The funding for <br /> this Phase will be administered by the USDOT, requiring coordination with USDOT and environmental <br /> permitting per USDOT standards. Phase 2 will be bid and constructed as a single project separate from <br /> Phase 3; it will not rely on USDOT funding and thus will not require USDOT coordination or <br /> environmental permitting. (Phase 1 is under construction and will not be included in this contract, except <br /> for the Phase 1 As-Built GPS Data survey described in Task Order 1.) <br /> To facilitate Plummer's work in Phases 2 and 3 above, the City asked Plummer to prepare this Task Order <br /> Contract to address the design, bidding, and construction of those phases, as well as the environmental <br /> permitting and USDOT coordination required for Phase 3. Because this is a Task Order Contract, the City <br /> shall authorize each task order as necessary to complete that portion of the work towards the overall <br /> Project.The Scope identified in the following paragraphs is based on the current understanding of the <br /> project needs; it may need to be adjusted prior to issuance of individual Task Orders to accommodate <br /> future changes in site conditions and City needs. Correspondingly, all fees shown are estimates;final fees <br /> will be determined at the time of task order issuance. <br /> Project Summary <br /> Proposed Improvements <br /> Proposed improvements were originally detailed in the July 2019 Preliminary Engineering Report (PER) <br /> on Sunset Acres Storm Drain improvements submitted by Plummer to the City, as well described in <br /> Contract#218-394 and its Changes in Service#1—#6. A summary of the improvements is as follows: <br /> Page 1 of 22 <br /> Documentl <br />