My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2024-025 amending the regulations and standards of the Paso Robles (Kissing Tree) Planned Development District (PDD), consisting of approximately 1,338.58 acres of land, generally located in the area of Centerpoint Road and Hunter Road
San-Marcos
>
City Clerk
>
02 Ordinances
>
2020's
>
2024
>
Ord 2024-025 amending the regulations and standards of the Paso Robles (Kissing Tree) Planned Development District (PDD), consisting of approximately 1,338.58 acres of land, generally located in the area of Centerpoint Road and Hunter Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 10:47:26 AM
Creation date
7/28/2024 3:18:15 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Amending
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. SERVICES AND INFRASTRUCTURE <br />All internal water, wastewater, and reclaimed water improvements and any water, <br />wastewater, and reclaimed water off -site facilities shall be built in accordance with the <br />requirements of the CSM. <br />Water, wastewater, & reclaimed water lines will be located to allow accessibility to utility <br />vehicles and personnel for maintenance and repair. Water, wastewater, & reclaimed water <br />lines will be located within streets and roadways unless conditions prohibit <br />When alleys are used: alleys will be designed with "dry" utilities and "wet" utilities will be <br />located in the public streets. <br />All construction of streets, drainage and utilities shall be reviewed and approved by the <br />City. <br />1. Water <br />All internal water improvements and any off -site facilities shall be built in accordance with <br />the requirements of the utility provider and sized to accommodate the service units as well <br />as the Fire Flows in accordance with the CSM ordinances. (Refer to Exhibit II-5) <br />All water and wastewater stub -outs within platted areas will be extended to the property <br />line or edge of pavement. <br />Automatic flush valves will be installed on all permanent dead-end water mains. <br />Demand <br />The water system infrastructure will be sized to accommodate approximately 6,750 <br />service unit equivalents (SUEs) in coordination with the City of San Marcos Water System <br />Plan for 2017. All planned improvements will serve as components of the City's intent to <br />bring Paso Robles water from the Soyars and McCarty pressure planes into the Surface <br />Water Treatment Pressure Plane (SWTPP and Trunk Hill pressure planes as shown on <br />the City of San Marcos Water System Plan for 2017). <br />2. Wastewater <br />Service Provider <br />All internal wastewater improvements and any off -site facilities shall be built in accordance <br />with the requirements of the utility provider. (Refer to Exhibit II-6) <br />Collection <br />Paso Robles will be served by gravity sewer mains where possible and force mainswhere <br />needed. Septic systems will not be utilized over the Recharge Zone, Contributing Zone, <br />or the Contributing Transition Zone. Any area within the Property outside of such Zones <br />shall not utilize septic systems unless approved by the City on a case by case basis for <br />-20- <br />
The URL can be used to link to this page
Your browser does not support the video tag.