12.1.1. SMTXU and LCRA TSC are to share access to the substation by <br /> LCRA TSC hardened locks in the gate and in the control enclosure doors. <br /> 12.2. Joint Use of Structures and Easements <br /> The Parties will execute a separate Joint Use Agreement("JUA")defining the <br /> terms and conditions for SMTXU's joint use and attachment to LCRA TSC's <br /> Strahan to Hilltop 138-kV transmission line. <br /> 13. Project Responsibilities: <br /> 13.1. Project Name: Strahan Substation Addition <br /> 13.2. Projected In-Service Date(s): May 15, 2025 <br /> 13.3. Project Costs: Each Party will be responsible for all costs incurred in connection <br /> with the design,procurement,and construction activities for the facilities it owns. <br /> -----The remainder of this page has intentionally been left blank----- <br /> FourthAmendment to the Interconnection Agreement between LCRA TSC and SMTXU Page 6 of 7 <br />