Laserfiche WebLink
Binding Construction/Installation Proposal <br /> CUSTOMER: San Marcos Fire Dept. <br /> LCRA and the City of San Marcos Attn: Chief Les Stephens <br /> 630 E. Hopkins <br /> This Binding Construction/Installation Proposal(this"Proposal")is San Marcos,TX 78666 <br /> issued under and subject to that certain Interlocal Cooperation Act <br /> Agreement for Mobile Radio Services and Equipment between the <br /> Parties listed above(the"Interlocal Agreement"). This Proposal is <br /> further subject to the Terms and Conditions attached hereto. <br /> In the event of any conflict or inconsistency between the terms and <br /> provisions of this Proposal and the terms and provisions of the <br /> Interlocal Agreement,with respect to the Project identified below only, <br /> the terms and provisions of this Proposal shall control. <br /> PROJECT: 3288 Zorn to San Marcos P25 Site Upgrades <br /> DATE SUBMITTED: June 17,2024 <br /> PRICING EXPIRES: August 28,2024 <br /> SERVICES: <br /> Pricing is contingent upon the City of San Marcos providing fiber between the San Marcos Radio site and the Hays County <br /> CECC. <br /> o If this fiber is not in place by December 31,2024 LCRA will add a Microwave addition between the San Marcos <br /> Radio site and McCarty Lane Substation for increased transport redundancy and security. <br /> o If LCRA installs the Microwave addition in lieu of fiber to be provided by the City of San Marcos,LCRA will <br /> invoice an additional$140,000 for the Microwave addition. <br /> • Upgrade existing 10-Channel Multicast site at San Marcos Radio site to a 10-Channel Simulcast site. <br /> • Utilize existing Infrastructure, including Shelter, Generator, Uninterruptible Power Supply (UPS), and Antenna <br /> System <br /> • Structural Assessment of San Marcos Radio Site <br /> • Frequency Coordination <br /> • Stage LCRA Emergency Communications Unit(ECU Mobile site)at San Marcos Radio Site during channel upgrade <br /> • Install a 10-Channel Simulcast site and Antenna System at the Zorn Radio site <br /> o Co-locate equipment on LCRA 320'tower being constructed at this location to support LCRA critical needs <br /> o Microwave addition between Zorn Radio site and San Marcos Radio site for increased transport redundancy <br /> and security <br /> o Utilize existing LCRA Shelter and Generator <br /> o Frequency Coordination <br />