My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-164 approving a list of Qualified On-Call Subsurface Utility Exploration firms to provide services to the City on an as-needed basis for a period of five years, in an amount not to exceed $250,000 per firm over five years
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-164 approving a list of Qualified On-Call Subsurface Utility Exploration firms to provide services to the City on an as-needed basis for a period of five years, in an amount not to exceed $250,000 per firm over five years
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2025 11:20:42 AM
Creation date
9/9/2024 4:46:16 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-164
Date
9/3/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: B94A7A7D-AOC2-4E5C-867B-62FAAB4A6E80 <br /> 12. Is there standard language grantees can include in subrecipient/bid contract <br /> documents? <br /> Grantees should include the BABA language from their grant agreement in any subrecipient <br /> and bid contract documents to ensure BABA compliance by subrecipients, developers <br /> and/or contractors. Please refer to Addendum 3 for the language used in CPD grant <br /> agreements. <br /> Waivers <br /> 13. Are there any waivers available for the BAP? <br /> There are currently four general applicability waivers in effect for HUD programs that apply <br /> to CPD programs: 1) Phased Implementation Waiver, 2) Exigent Circumstances Waiver, 3) <br /> De Minimis, Small Grants, and Minor Components Waiver, and 4) Tribal Recipients <br /> Waiver. The details of each of these waivers can be found in Section IV of this Notice, or <br /> by visiting HUD's BABA website to see the latest available HUD waivers at: <br /> https://www.hud.aov/program_offices/general counsel/baba. Waivers, as they are approved <br /> by the MIAO, will be updated on HUD's website. <br /> 14. Will there be project or product specific waivers of the BAP? <br /> In addition to HUD's general waivers,HUD may also grant"project-specific"waivers from <br /> the BAP for covered FFA on a limited, case-by-case basis, after consultation and review <br /> with the MIAO at OMB. HUD may issue a project-specific waiver to the BAP if it is <br /> determined that a waiver falls into one of the following three categories: 1)when applying <br /> the domestic content procurement preference would be inconsistent with the public interest, <br /> 2)when types of iron, steel, manufactured product or construction materials are not <br /> produced in the United States in sufficient and reasonably available quantities or of a <br /> satisfactory quality, or 3)where the inclusion of those products and materials will increase <br /> the cost of the overall project by more than 25 percent. A waiver for a specific project may <br /> vary depending upon the circumstances of the project, and specific items,products, or <br /> materials in question. . HUD is currently developing the process through which a grantee <br /> may request a waiver. More information will be made available once that process is <br /> developed. <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.