Laserfiche WebLink
Watershed Protection Plan Phase I (WPP1) $2,000.00 <br /> Watershed Protection Phase 11 (WPP2) $1,500.00 plus $100/acre, Max$5000 <br /> Comprehensive Watershed Protection Plan Phase 2 (Includes WPP1 <br /> review) 1$2,000.00 plus$150/acre, Max$5000 <br /> jo "I <br /> Public Improvement Construction Plan (PICP) $2,000.00 plus$200/acre, Max$5000 <br /> Comprehensive PICIP (includes WPP2 review) $2,500.00 plus $200/acre, Max$5000 <br /> Out of City Utility Extension $1,000.00 <br /> Out of City Utility Connection $650.00 <br /> Site Preparation $2,000.00 plus $200/acre, Max$5000 <br /> Comprehensive Site Permit(includes WPP2 review) $2,500.00 plus $200/acre, Max$5000 <br /> Small Site Permit(under 1000 sf impervious cover) $2,000.00 <br /> Traffic Impact Analysis (TIA) $1,200.00 <br /> TIA(Worksheet) $150.00 <br /> Residential (Type 1) Driveway or Sidewalk $100.00 <br /> Commercial (Type 11) Driveway or Sidewalk $200.00 <br /> Floodplain permit application (Single Family) $50.00 <br /> Floodplain permit application (Commercial) $250.00 <br /> Single Family Infill-City Flood Analysis Fee $1,500.00 <br /> Floodplain Development Flood Analysis Review Fee $1,200.00 <br /> CLOMR(Conditional Letter of Map Revision) or LOMR (Letter of Map <br /> Revision)without approved CLOMR $3,700.00 <br /> LOMR(with approved CLOMR) $1,700.00 <br /> LOMA(Letter of Map Amendment) $550.00 <br /> All multipliers should be rounded to the nearest whole nurnber 4 <br />