My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-188 approving the schedule of fees for Fiscal Year beginning October 1, 2024 and ending September 30, 2025; reauthorizing the building permit fees
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-188 approving the schedule of fees for Fiscal Year beginning October 1, 2024 and ending September 30, 2025; reauthorizing the building permit fees
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2024 11:51:01 AM
Creation date
9/24/2024 11:50:44 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
20241-188
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STORMWATER/DRAINAGE UTILITY '.! FY24EIIIEM� (UOM) <br /> RESIDENTIAL RATES ADOPTED FEE(s) PROPOSED FEE(s) UNIT OF MEASURE <br /> Small Residential $ 9.14 $ 9,14 0-1,980 SQ FT Of Impervious Cover <br /> Typical Residential $ 14.90 $ 14.90 1980-3363 SQ FT.Of Impervious Cover <br /> Large Residential $ 21.77 $ 21.77 >3,363 SQ FT Of Impervious Cover <br /> COMMERCIAL RATES <br /> Non-Residential properties such as Commercial,Industrial,Retail,Government, $ 14.90 $ 14.90 per ERU <br /> Multi-Family,with more than 4 Units <br /> A non-Residential Porpoerty is billed based on the total amount of impervious cover associated with the non-residential use divided by the ERU value of 2,575 square feet <br /> PARKS&RECREATION-Cemetery FY24 11111§111MMM (UOM) <br /> CEMETERY FEES ADOPTED FEE(s) PROPOSED FEE(s) UNIT OF MEASURE <br /> Burial Lot Fee $ 2,100.00 $ 2,100.00 Residents <br /> Burial Lot Fee $ 2,600.00 $ 2,600.00 Non-Residents <br /> Memorial Bench $ 2,000.00 $ 2,000.00 <br /> Payment Plan Administrative Fee $ 50.00 $ 50.00 <br /> Plaque in Chapel $ 100.00 $ 100.00 <br /> Name Archival Fee(ONLY) $ 50.00 $ 50.00 <br /> Serenity Garden Plaque&Name Archival $ 225.00 $ 225.00 <br /> Archival Fee for Buried Cremains w/in Cemetery Lot $ 50.00 $ 50.00 <br /> Cemetery Benches $ 350.00 $ 350.00 Chapel <br /> Cemetery Benches $ 3,700.00 $ 3,700.00 Elsewhere <br /> Cemetery Tree $ 1,250.00 $ 1,250.00 <br /> PLANNING&DEVELOPMENT Fy2w, (UOM) <br /> MISCELLANEOUS FEES* ADOPTED FEE(s) PROPOSED FEE(s) UNIT OF MEASURE <br /> Technology Fee(applied to all permits) $ 15.00 $ 15.00 <br /> Resubmittal Fee $ 300.00 $ 300.00 Each resubmittal after the second <br /> Reinspection Fee $ 250.00 $ 250.00 <br /> $200 flat fee for homeowner's work without <br /> Work begun without a permit Double the normal fee Double the normal fee Permit <br /> After Hours Inspection Fee $ 250.00 $ 250.00 Per hr,2 hr minimum <br /> Weekend&After Hours Public Improvement Inspection $ 250.00 $ 250.00 Per hr,4 hr minimum <br /> Renotification fee $ 150.00 $ 150.00 <br /> *Fees applicable across all departments/divisions <br /> FEE-IN-LIEU <br /> Sidewalk Fee-in-Lieu $ 10.00 $ 10.00 Per square foot <br /> Protected Trees Fee-in-Lieu $ 175.00 $ 175.00 Per Caliper Inch <br /> Heritage Tree Fee-in-Lieu $ 350.00 $ 350.00 Per Caliper Inch <br /> Water Quality Fee-in-Lieu $ 0.35 $ 0.35 Per square foot <br /> Per quare foot or a City approved Engineer's <br /> Detention Fee-in-Lieu $ 9.00 $ 9.00 Estimate of cost to construct <br /> Parking Fee-in-Lieu $ 7,500.00 $ 7,500.00 Per Space <br /> Parkland Development Fee $ 423.00 $ 423.00 Per Unit <br /> Parkland Fee-in-Lieu $ 317.00 $ 317.00 Per Unit <br /> BUILDING <br /> Application Deposit-non refundable,paid up front&applied to permit <br /> balance,allows plans to go into review 1/2 of permit fee 1/2 of permit fee max$2,000 <br /> Single Family residential $ 0.60 $ 0.60 Per square foot <br /> All other categories of construction,including shell building $ 0.75 $ 0.75 Per square foot <br /> Additions to an existing building(Residential) $ 0.60 $ 0.60 Per square foot <br /> Additions to an existing building(All other categories) $ 0.75 $ 0.75 Per square foot <br /> Interior Remodel(Residential) $ 0.40 $ 0.40 Per square foot <br /> Interior Remodel Commercial(includes Tenant finish arts) $ 0.75 $ 0.75 Per square foot <br /> Multi-Family Fee $ 10.00 $ 10.00 Per bedroom <br /> Multi-Family Improvement Credit $ 15.00 $ 15.00 Per bedroom credit(applied to Permit) <br /> Storage Building $ 100.00 $ 100.00 <br /> BUILDING(ELECTRICAL) <br /> Residential Stand-Alone $ 60.00 $ 60.00 <br /> Commercial Stand-Alone $ 95.00 $ 95.00 <br /> Multi-Family Child Permit(Pulled under a GC) $ 40.00 $ 40,00 Per Unit <br /> Child Permit(Pulled under a GC) $ 55.00 $ 55.00 <br /> Mobile Home Child Permit(Pulled under mobile home permit) $ 25.00 $ 25.00 <br /> BUILDING(MECHANICAL) <br /> Residential Stand-Alone $ 60.00 $ 60.00 <br /> Commercial Stand-Alone $ 95.00 $ 95.00 <br /> Multi-Family Child Permit(Pulled under a GC) $ 40,00 $ 40.00 Per Unit <br /> Child Permit(Pulled under a GC) $ 55.00 $ 55.00 <br /> Mobile Home Child Permit(Pulled under mobile home permit) $ 25.00 $ 25.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.