Laserfiche WebLink
Docusign Envelope ID:7208C774-7FB3-420E-A93E-5DE887787BB7 <br /> COMPENSATION <br /> Compensation to LAN, Inc.shall be a lump fee based on the following Schedule of Charges. <br /> LAN Max Hourly Rate Schedule: 2024 <br /> Labor/Job Classification Rate <br /> Project Principal $ 350.00 <br /> Sr. Project Manager $ 320.00 <br /> Technical Manager $ 295.00 <br /> Quality Manager $ 300.00 <br /> Sr. Project Engineer $ 285.00 <br /> Project Engineer $ 260.00 <br /> Project Engineer IV $ 240.00 <br /> Project Engineer III $ 200.00 <br /> Project Engineer II $ 175.00 <br /> Project Engineer 1 $ 165.00 <br /> Engineer-In-Training III $ 150.00 <br /> Engineer-In-Training II $ 140.00 <br /> Engineer-In-Training 1 $ 125.00 <br /> Engineer Technician - Senior $ 165.00 <br /> Engineer Technician $ 130.00 <br /> Sr. CADD Technician $ 140.00 <br /> CADD Technician $ 125.00 <br /> Construction Inspector- Senior $ 225.00 <br /> Construction Inspector II $ 142.00 <br /> Administrator Specialist $ 120.00 <br /> Direct Expenses: <br /> Direct expenses are reimbursed at actual cost times a multiplier of 1.5.They include printing and <br /> reproduction expenses,communication expenses,travel,transportation and subsistence away from the <br /> LAN office and other miscellaneous expenses direclty related to the works, including costs of laboratory <br /> analysis,test, and other work required to be done by independent persons other than staff members. <br /> These ranges and rates will be adjusted annually in May. Last updated May 2024. <br /> 1 <br />