My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-190 approving an On-Call Professional Services Agreement with Lockwood, Andrews and Newnam, Inc., (LAN) to provide engineering services for the Purgatory Creek Improvements, Phase 1 Project in an amount not to exceed $3,281,773.35
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-190 approving an On-Call Professional Services Agreement with Lockwood, Andrews and Newnam, Inc., (LAN) to provide engineering services for the Purgatory Creek Improvements, Phase 1 Project in an amount not to exceed $3,281,773.35
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2024 6:23:38 PM
Creation date
9/26/2024 4:28:04 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
Res 2024-190
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID:7208C774-7FB3-420E-A93E-5DE887787BB7 <br /> to 2 CFR 184.5. <br /> iii. In the case of construction materials, all manufacturing processes for the <br /> construction material occurred in the United States. See 2 CFR 184.6 for <br /> more information on the meaning of"all manufacturing processes" for <br /> specific construction materials. <br /> W. Project. The term"proj ect"means the construction, alteration,maintenance, or repair of <br /> infrastructure in the United States. (Section 70912(7)of BABA). <br /> X. Section 70917(c)Materials. The term"section 70917(c)materials"is defined in 2 CFR <br /> 184.3 and means cement and cementitious materials; aggregates such as stone, sand, or <br /> gravel, or aggregate binding agents or additives. These materials are not considered <br /> "construction materials" for the purpose of BABA implementation. <br /> Y. Specifically listed construction materials. The term"specifically listed construction <br /> materials" for HUD programs includes: <br /> a. non-ferrous metals; <br /> b. lumber; <br /> c. composite building materials; and <br /> d. plastic and polymer-based pipe and tube. <br /> III. Applicability of the BAP on CPD Programs <br /> Under Sections 70912 and 70914,the BAP applies to the purchase of iron, steel, <br /> manufactured products, and construction materials for Covered CPD Programs when funds are used <br /> for the construction, alteration,maintenance, or repair of infrastructure, as defined by BABA. <br /> Covered CPD Programs currently include: <br /> • Community Development Block Grant Formula Programs (CDBG) <br /> • Section 108 Loan Guarantee <br /> • HOME Investment Partnerships Program (HOME) <br /> • HOME Investment Partnerships American Rescue Plan Program (HOME-ARP) <br /> • Housing Trust Fund(HTF) <br /> • Recovery Housing Program (RHP) <br /> • Emergency Solutions Grants (ESG) <br /> • Continuum of Care(CoQ <br /> • Housing Opportunities for Persons With AIDS (HOPWA) <br /> • Self-Help Homeownership Opportunity Program (SHOP) <br /> • Special NOFA for unsheltered and rural homeless <br /> • Veterans Housing Rehabilitation and Modification Program (VHRMP) <br /> • Community Project Funding (CPF)/Economic Development Initiatives (EDI) <br /> • Section 4 Capacity Building <br /> • Rural Capacity Building <br /> • Pathways to Removing Obstacles to Housing(PRO Housing) <br /> • Preservation and Reinvestment Initiative for Community Enhancement(PRICE) <br />
The URL can be used to link to this page
Your browser does not support the video tag.