My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-190 approving an On-Call Professional Services Agreement with Lockwood, Andrews and Newnam, Inc., (LAN) to provide engineering services for the Purgatory Creek Improvements, Phase 1 Project in an amount not to exceed $3,281,773.35
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-190 approving an On-Call Professional Services Agreement with Lockwood, Andrews and Newnam, Inc., (LAN) to provide engineering services for the Purgatory Creek Improvements, Phase 1 Project in an amount not to exceed $3,281,773.35
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2024 6:23:38 PM
Creation date
9/26/2024 4:28:04 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
Res 2024-190
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID:7208C774-7FB3-420E-A93E-5DE887787BB7 <br /> Materials Other Than Iron or Steel <br /> CDBG&RHP Programs All Other Covered CPD Programs <br /> Specifically Listed The BAP will apply to FY2024 The BAP will apply to funds from all <br /> Construction Materials and subsequent CDBG and other Covered CPD programs <br /> (Non-Ferrous Metals, RHP awards used to purchase obligated on or after August 23,2024, <br /> Lumber, Composite specifically listed construction used for the purchase of specifically <br /> Building Materials, materials as well as to purchase listed construction materials as well as <br /> Plastic and Polymer iron and steel. iron and steel for infrastructure <br /> Based Pipe and Tube) projects. <br /> The BAP will apply to FY2025 The BAP will apply to all Covered <br /> and subsequent CDBG and CPD program (except CDBG and <br /> Not Listed RHP awards used to purchase RHp) funds obligated on or after <br /> Construction Materials not listed construction materials August 23,2024,used for the purchase <br /> for infrastructure projects. of not listed construction materials, as <br /> well as specifically listed construction <br /> materials and iron and steel, for <br /> infrastructure projects. <br /> The BAP will apply to FY2025 The BAP will apply to all Covered <br /> and subsequent CDBG and CPD program funds (except CDBG <br /> Manufactured RHP awards used to purchase and RHP)obligated on or after August <br /> Products manufactured products as well 23, 2024, used for the purchase of <br /> as specifically listed manufactured products for <br /> construction materials and iron infrastructure projects. <br /> and steel, for infrastructure <br /> projects. <br /> Applying the BAP and HUD Waivers to CPD Programs <br /> Once the BAP applies to an infrastructure project, a grantee must: <br /> 1. Comply with the BAP, or <br /> 2. Utilize one of HUD's general waivers, or <br /> 3. Obtain a project-specific waiver to exclude the project from the BAP. <br /> As a part of its record keeping, a CPD grantee should document its process to analyze if the <br /> BAP applies to a project using the approach below: <br /> Step 1: Type of proiect/activity <br /> Are the funds being used for an infrastructure project, as defined by BABA and explained in this <br /> notice? <br /> • If yes, proceed to step 2. <br /> • If no,the BAP does not apply. The BAP only applies to infrastructure projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.