Laserfiche WebLink
H. The cost for Single-stream recycling service is listed in"Attachment A". <br /> 1.3.3 Residential Green Waste Collection <br /> A. The Contractor will collect green waste materials listed in Attachment B from each residential unit <br /> in the contract area one time every-other week basis <br /> With a mutual agreement between Director and Contractor, the Contractor will have the right to <br /> add or delete material types from time to time based upon the commercial markets for the materials. <br /> Customers will not be required to separate materials by type prior to collection. All green waste <br /> materials collected by the Contractor will become its property. Green waste materials consist of <br /> green waste, yard waste, soiled paper, tree limbs no longer than four (4) feet and up to five (5) <br /> inches in diameter. Such green waste material will not be comingled with municipal solid waste by <br /> the Contractor.Notwithstanding,the Contractor will not discard any portion of the collected green <br /> waste materials unless they make up a de minimus amount included within the non-recyclable <br /> residual remaining.Unauthorized disposal of green waste materials,which were collected as green <br /> waste materials, is strictly prohibited. <br /> B. The Contractor will furnish each residential unit with a 35- or 96- gallon cart for green waste <br /> materials. The Contractor will supply a dumpster, if requested by the City (for townhomes only). <br /> These carts or dumpsters will be serviced on an every-other-week basis.The contractor will provide <br /> casters for dumpsters when necessary and requested by the City. The director and contractor will <br /> verify through site visit if the property requires casters. <br /> C. The Contractor will collect up to 12 paper yard bags of green waste materials residents place out <br /> for removal with the green waste cart. <br /> D. The Contractor will notify the City of all instances where the Contractor declines to collect Green <br /> Waste Materials and the reason for it. The Director will investigate all instances of"no pickups," <br /> whether reported by the Contractor or by customers, and advise the customer of the reasons, or <br /> require the Contractor to collect the material.The Director will act in reasonable manner in deciding <br /> these issues, and the Director's decision will be final. <br /> E. The Contractor will discontinue Green Waste Materials collection services to any location as set <br /> forth in a written notice sent to the Contractor by the City. The Contractor will resume collection <br /> service at the location on the next regularly scheduled collection day upon written notice from the <br /> City. <br /> F. The Contractor will have all Green Waste Materials collected by it processed at a Green Waste site. <br /> The Contractor will ensure that any such site used by it is properly licensed or permitted by the <br /> State of Texas and other governmental entities having jurisdiction. The Contractor may dispose of <br /> any contaminated recyclable materials collected. <br /> G. The Contractor will provide three(3)compost dumpsters for to go pizza boxes to pilot at designated <br /> multifamily complexes. If the pilot is successful, the compost dumpster for to go pizza boxes will <br /> expand to all multifamily complexes. This will require additional cost. <br /> 1.3.4 Residential Unit Bulk Waste and Yard Waste Collection <br /> A. The Contractor will collect bulk waste and yard waste from each residential unit four(4)times per <br />