Docusign Envelope ID: BB27E2CA-90E7-44DF-ACD6-60284C2E92F6 <br /> ATTACHMENT A <br /> CITY OF SAN MARCOS <br /> WALLACE ADDITION SUBDIVISION IMPROVEMENTS <br /> SCOPE OF SERVICES <br /> • Structural Sheets (if needed): Estimated Number of Sheets two (2). <br /> • Retaining Walls (if needed): Estimated Number of Sheets—two (2). <br /> • Sanitary Sewer Main Pipeline Plan and Profile Sheets: Estimated Number of <br /> Sheet—twenty (20). <br /> • Sanitary Sewer Bypass Plans: Estimated Number of Sheets—ten (10). <br /> • Potable Water Pipeline Plan and Profile Sheets: Estimated Number of Sheets— <br /> twenty-two (22). <br /> • Utility Conflict Matrix and Layout Plans: Estimated number of Sheets—four (4). <br /> • Storm Water Pollution and Prevention Plan (SW3P): Estimated Number of <br /> Sheets -eight (8). <br /> • Cross Sections Sheet: Estimated number of Sheets—ten (10) <br /> • List of Standard Details: City of San Marcos details will be used. <br /> • Geographic Information System (GIS) Submittal: As per Plan Review Checklist. <br /> • Hydrologic Calculations and Drainage Area Map. <br /> • List of Standard Specifications: City of San Marcos Division 1 specifications will <br /> be used. City of Austin standard specifications will be used. <br /> • Engineer's Opinion of Probable Construction Costs (OPCC)—Class 2 Standard. <br /> • Construction Project Schedule: Consultant will develop a Construction Schedule <br /> for the project consisting of design, bid and construction phases. The schedule <br /> will be updated during subsequent design phases. Prepare 99% project manual, <br /> including contracting documents, list of standard specifications, general <br /> provisions, special specifications and any other necessary documents. Technical <br /> specifications will reference City of San Marcos Construction Specifications and <br /> Standards. For items not covered by the standards, a special project <br /> specification will be prepared for inclusion in the project manual. <br /> • Engineer's OPCC Class 1 Standard. <br /> • Construction Project Schedule: Consultant will develop a Construction Schedule <br /> for the project consisting of design, bid and construction phases. The schedule <br /> will be updated in subsequent design submittals. <br /> g. 99% Comment Response Letter. After 99% deliverable review, the Consultant will <br /> document all City review comments and document how each comment was addressed <br /> and incorporated into the 100% deliverable. <br /> h. Final 100%: Consultant will provide two (2) hard copies of 11"x 17" plan sets and one (1) <br /> pdf electronic copy. Upon approval by the City, two (2) hard copies of 22"x 34" plan sets, <br /> one (1) pdf copy, and one (1) CAD copy (DWG format) of the sealed plans will be <br /> provided. <br /> i. (PROTECT) grant for the Wallace Addition Subdivision. <br /> E. Design Phase Schedule: <br /> 60% Design Documents Submittal (120 days) <br /> 90% Design Documents Submittal (90 days) <br /> 99% Design Documents Submittal (60 days) <br /> 100% Design Documents Submittal (30 days) <br /> 10 <br />