My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-219 approving an On-Call Agreement with Tetra Tech, Inc., for engineering design, bid and construction phase services for the Wallace Addition Subdivision Improvements Project, in an amount not to exceed $2,000,000.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-219 approving an On-Call Agreement with Tetra Tech, Inc., for engineering design, bid and construction phase services for the Wallace Addition Subdivision Improvements Project, in an amount not to exceed $2,000,000.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 10:43:40 AM
Creation date
11/18/2024 11:23:43 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-219
Date
11/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: BB27E2CA-90E7-44DF-ACD6-60284C2E92F6 <br /> Mr.Jaime R. Kypuros,Jr.,PE <br /> City of San Marcos Wallace Subdivision <br /> August 13,2024 <br /> SGT 24 1041 <br /> City of San Marcos Wallace Subdivision <br /> HVJ South Central Texas M&J,Inc. <br /> HVJ SCTx Proposal No.SGT 24 1041 <br /> Geotechnical Field Investigation-Drilling and Soil Sampling <br /> Mobilization/Demobilization 1 y) $650.00 per mobilization $650.00 <br /> Drilling&Sampling-Soil Drilling 120 y) $30.00 per foot $3,600.00 <br /> Shelby Tube(ThiiiWAU) 24 y) $20.00 each $480.00 <br /> Backfilling Soils/Bentonite 120 y) $6.00 per foot $720.00 <br /> Asphalt Patching 8 y) $50.00 each $400.00 <br /> Driller Standby time 4 y) $150.00 per hour $600.00 <br /> Lo_-o iig 20 y) $85.00 per hour $1,700.00 <br /> StAkil_Utility Clearance,permit Coordination 8 y) $85.00 per hour $680.00 <br /> Traffic Control 2 y) $2,500.00 each $5,000.00 <br /> Support Truck 2 y) $150.00 each $300.00 <br /> Sub Total $14,130.00 <br /> Laboratory Testing <br /> Moisture Content(ASTM D 2216) 30 y) $25.00 each $750.00 <br /> AtterbergLimits(ASTMD 4318;Tex-104-E;Tex-105-E And Tex-106-E) 16 y) $85.00 each $1,360.00 <br /> No.200 sieve(ASTM D 422) 16 y) $55.00 each $880.00 <br /> Unconfined Compressive Strength Test-Soil(ASTM D 2166) 8 y) $70.00 each $560.00 <br /> Corrosion(pH,Resistvity,Sulfate and Chloride) 1 y) $500.00 each $500.00 <br /> Sub Total $4,050.00 <br /> Non Destructive Testing(FWD) <br /> FXX/D Mobilization/Demobilization 50 y) $3.00 miles $150.00 <br /> FXX/D Equipment 1 y) $3,300.00 day $3,300.00 <br /> Traffic Control Mobil Operation 1 y) $1,800.00 day $1,800.00 <br /> Sub Total $5,250.00 <br /> Geotechnical Engineering&Reporting <br /> Project Management,QA/QC report 4 a) $200.00 /hr $800.00 <br /> Senior Engineer 16 y) $185.00 /hr $2,960.00 <br /> Engineer in Training 40 y) $100.00 /hr $4,000.00 <br /> Adm nistrative Assistant 4 y) $75.00 /hr $300.00 <br /> Sub-Total $8,060.00 <br /> Pavement Design&Reporting <br /> Project Management,QA/QC report 8 y) $200.00 /hr $1,600.00 <br /> Senior Engineer 24 a) $185.00 /hr $4,440.00 <br /> Engineer in Training 40 a) $100.00 /hr $4,000.00 <br /> Adm nistrative Assistant 4 y) $75.00 /hr $300.00 <br /> Sub-Total $10,340.00 <br /> Grand Total $41,830.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.