My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-219 approving an On-Call Agreement with Tetra Tech, Inc., for engineering design, bid and construction phase services for the Wallace Addition Subdivision Improvements Project, in an amount not to exceed $2,000,000.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-219 approving an On-Call Agreement with Tetra Tech, Inc., for engineering design, bid and construction phase services for the Wallace Addition Subdivision Improvements Project, in an amount not to exceed $2,000,000.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 10:43:40 AM
Creation date
11/18/2024 11:23:43 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-219
Date
11/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: BB27E2CA-90E7-44DF-ACD6-60284C2E92F6 <br /> McGRAY & McGRAY <br /> LAND SURVEYORS,INC. <br /> May 29, 2024 <br /> Kyle Hogue <br /> RPS I North America VIA EMAIL <br /> 5810 Tennyson Parkway, Suite 280 kyle.hoguegtetratech.com <br /> Plano, TX 75024 <br /> (469) 677-3005 <br /> RE: Proposal for Surveying Services for the Wallace Addition, San Marcos, Texas <br /> Dear Mr. Hogue: <br /> We appreciate the opportunity to present you with this proposal for the above-referenced <br /> project. The following represents our understanding of the area to survey and scope of <br /> services. Our fee proposal follows. <br /> Area to Survey: <br /> * The Wallace Addition, as defined onattached Exhibits "A, B & C". <br /> Survey Control: <br /> • Horizontal Control: The survey will be provided in Texas State Plane, South <br /> Central Zone,NAD 83, Grid coordinates with a note defining the Grid to Surface <br /> Scale factor. <br /> • Vertical Control: Elevations will be obtained using NAVD 88, Central Zone, <br /> EPOCH 20 10.00, Geoid 2018 and at least three(3)benchmarks will be established <br /> onsite, and descriptions will be provided on the drawing. <br /> Scope of Services: <br /> Design Survey: <br /> 1. Full topography with enough detail to prepare I' contours for the project area as <br /> identified in Exhibit A, including portions of Staples Road, Tampico Street, Juarez <br /> Avenue,Laredo Street, Saltillo Street,Durango Street, Cape Road,Monterrey Street <br /> and Luciano Flores Boulevard. <br /> 2. Locate and identify all above ground features within the survey limits including <br /> buildings, fences, sidewalks, driveways, handicap ramps, guardrails, signs, visible <br /> utilities including: manholes, water meters, top of nut of water and gas valves, <br /> telecom boxes, utility poles and mailboxes. <br /> 3301 HANCOCK ORIVE,SUITE 6 <br /> AUSTIN,TEXAS 78731 <br /> C5!2)451--8E521 FAX(512)451-S791 <br />
The URL can be used to link to this page
Your browser does not support the video tag.