My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-219 approving an On-Call Agreement with Tetra Tech, Inc., for engineering design, bid and construction phase services for the Wallace Addition Subdivision Improvements Project, in an amount not to exceed $2,000,000.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-219 approving an On-Call Agreement with Tetra Tech, Inc., for engineering design, bid and construction phase services for the Wallace Addition Subdivision Improvements Project, in an amount not to exceed $2,000,000.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 10:43:40 AM
Creation date
11/18/2024 11:23:43 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-219
Date
11/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: BB27E2CA-90E7-44DF-ACD6-60284C2E92F6 <br /> oe Estimate for Subsurface Utility Engineering <br /> IIII IIII C lii1li I Wl36ii l li I EXHIBIT A <br /> IIII Vlwrcos. ......IIIIexas <br /> Direct Expenses Rate Assumed Unit of Sub-Total <br /> Quantity Measure <br /> Traffic Control (Standard) $ 350.00 8 DAY $ 2,800.00 <br /> ROW Permits $ 270.00 4 EA $ 1,080.00 <br /> Flowable Backfill $ 275.00 16 EA $ 4,400.00 <br /> Survey (RPLS) $ 2,500.00 5 DAY $ 12,500.00 <br /> Sub-Total $ 20,780.00 <br /> Hourly Office Labor Rate Assumed Unit of Sub-Total <br /> Quantity Measure <br /> Senior Project Manager $ 190.00 6 HR $ 1,140.00 <br /> Senior Professional Engineer $ 175.00 8 HR $ 1,400.00 <br /> Project Manager $ 150.00 32 HR $ 4,800.00 <br /> SUE Field Manager $ 105.00 16 HR $ 1,680.00 <br /> Assistant Project Manager $ 95.00 12 HR $ 1,140.00 <br /> CADD Tech 1 $ 90.00 32 HR $ 2,880.00 <br /> Project Coordinator $ 80.00 6 HR $ 480.00 <br /> Sub-Total $ 13,520.00 <br /> QL"B" SUE Designating Rate Assumed Unit of Sub-Total <br /> Quantity Measure <br /> 1-Man Crew- QL B &TH Layout $ 132.00 50 HR $ 6,600.00 <br /> 2-Man Crew $ 255.00 24 HR $ 6,120.00 <br /> Sub-Total $ 12,720.00 <br /> QL"A" SUE Test Holes <br /> Unit Rate- Depth Rate Assumed Unit of Sub-Total <br /> Quantity Measure <br /> 0- 6 feet $ 1,300.00 12 EA $ 15,600.00 <br /> 6.01 - 10 feet $ 1,750.00 4 EA $ 7,000.00 <br /> 10+ feet $ 2,800.00 EA $ - <br /> Every 1' deeper than 20' $ 300.00 EA $ - <br /> Pavement Coring $ 350.00 16 EA $ 5,600.00 <br /> Test Hole Total 16 <br /> Sub-Total $ 28,200.00 <br /> Total Estimated Cost $ 75,220.00 <br /> 1740 Universal City Boulevard, Suite 200 1 Universal City, Texas 781481 Phone: 210.981.3050 <br /> CL:III SLflfacc Ul.liillllIY III';IIIIIui liiui ccuimliiui Ul.liillllIY Cooii'6inaliiioin <br /> 812712024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.