My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-210 approving the award of a contract to Plummer Associates, Inc., to provide engineering services for the City of San Marcos Recycled Water Feasibility Study & Master Plan in the amount of $530,478.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-210 approving the award of a contract to Plummer Associates, Inc., to provide engineering services for the City of San Marcos Recycled Water Feasibility Study & Master Plan in the amount of $530,478.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 10:51:07 PM
Creation date
11/18/2024 11:34:30 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-210
Date
11/6/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID:3EDD0960-FFF6-43E2-8E49-1A7B2008A238 <br /> PLUMMER <br /> 9/12/2024 <br /> preferred alternative. <br /> c. Describe all Federal and non-Federal sources of funding and any restrictions on <br /> such sources, for example, minimum or maximum cost-share limitations. <br /> (3) Operational and administrative framework: <br /> a. The study will identify who is responsible for undertaking the actions necessary to <br /> implement each element of the implementation plan, including communicating <br /> with the public about those actions. <br /> (4) Financial Capability of Sponsor: <br /> a. Demonstrate financial capability if the projects move to construction. <br /> Task 11: Report <br /> (1) Prepare a draft Title XVI feasibility report that organizes and describes the work <br /> performed in the previous tasks and meets applicable requirements of RM Directives & <br /> Standards WTR 11-01. Provide the draft report to the City in electronic (pdf) format for <br /> comment. <br /> (2) Address comments from the City and prepare a final draft Title XVI feasibility report for <br /> submittal to the BoR in electronic format. <br /> (3) Address comments from the BoR and prepare a final report. Five printed copies and 1 <br /> electronic copy of the final report will be submitted to the City. <br /> Task 12: Project Management <br /> Monitor the project staffing, budget and schedule during the project. Provide information to <br /> the City needed to complete the semi-annual financial and program performance reports to the <br /> BoR. <br /> Task 13: Workshops and Meetings <br /> (1) Prepare for and facilitate a virtual kickoff meeting to review the scope and schedule of <br /> the project, establish communication protocols and discuss critical project success <br /> fa cto rs. <br /> (2) Prepare for and facilitate an in-person vision and goals workshop (Workshop #1) to <br /> obtain input from the City staff on water supply goals, strategies, vision and project <br /> success factors. Potential conceptual water supply options will be presented and <br /> discussed at the workshop. Based on feedback from the workshop, an initial list of <br /> options to be evaluated will be developed. <br /> (3) Prepare for and facilitate an in-person alternative ranking workshop (Workshop#2) <br /> following completion of Task 5 (Economic Evaluation). At the workshop each alternative <br /> will be presented and summarized. A ranking matrix approach will be used to identify <br /> key ranking criteria and score each alternative for both cost and non-cost factors.The <br /> outcome of the workshop will be a ranked list of alternatives and a recommended <br /> alternative for which a detailed implementation and funding plan will be developed. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.