My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-222 awarding an Indefinite Delivery Indefinite Quantity (IDIQ) Master Contract to Holbrook Asphalt Co., through an Interlocal Cooperative Purchasing Agreement with the City of Hurst, for the provision of high density mineral bond pavement seal
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-222 awarding an Indefinite Delivery Indefinite Quantity (IDIQ) Master Contract to Holbrook Asphalt Co., through an Interlocal Cooperative Purchasing Agreement with the City of Hurst, for the provision of high density mineral bond pavement seal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 11:17:52 AM
Creation date
11/25/2024 9:42:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-222
Date
11/19/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID:299E8425-667F-4E39-9D58-30E4C2B62B92 <br /> OWNER-CONTRACTOR AGREEMENT <br /> HIGH DENSITY MINERAL BOND SEAL IDIQ (ILA), 4224-301 <br /> STATE OF TEXAS <br /> COUNTY OF HAYS <br /> This Agreement(this "Agreement")is entered into by and between The City of San <br /> Marcos, a municipality in the State of Texas ("Owner"), and Holbrook Asphalt Co., 1545 E <br /> Commerce Dr, St George, UT 84790, ("Contractor"), and is effective for all purposes as of the date of <br /> the last signature to this Agreement("Effective Date"). <br /> Section 1. The Contractor agrees to commence, carry out, and complete all work for the <br /> construction of the Project for the Contract Amount of four hundred thousand dollars ($400,000.00) <br /> annually and within the Contract Time, in accordance with the Contract Documents. <br /> Section 2. The Owner agrees to pay the Contractor for the satisfactory performance of the Contract <br /> in accordance with the amount agreed to herein for all Work in accordance with the Bidding and Contract <br /> Documents, Project Manual, Drawings, and Addenda, which are incorporated herein by reference and <br /> described in Article 2 of the General Conditions which constitute the Contract between the Owner and the <br /> Contractor. Any unit prices contained in the Bid Form will apply to this Contract in case of subsequent <br /> quantity adjustments for work items. <br /> Section 3. The Contractor agrees to commence work by the project start date set in the Notice to <br /> Proceed, to finally complete and achieve final acceptance of the Project within the number of days <br /> specified in the Project Schedule on PS-1 which is incorporated by reference into this Owner-Contractor <br /> Agreement, subject to extensions of time as provided in the Contract Documents. Time is of the essence <br /> of this Agreement, and the Contractor acknowledges that the Owner will be damaged if the Contractor <br /> fails to complete the Project on time and in accordance with the Contract Documents. The Contractor <br /> agrees to ensure that workers' compensation insurance coverage will be provided for all persons employed <br /> on the Project. <br /> Section 4. The Contractor makes the following representations in order to enter into this <br /> Agreement with the Owner: <br /> a) The Contractor has examined, read, and understands the Contract Documents; <br /> b) The Contractor is familiar with the Project area and site, and all local, state, and federal laws <br /> and regulations that in any manner may affect cost,progress, or performance of the work; <br /> c) The Contractor has made and studied the results of examinations, investigations, and tests of <br /> subsurface and latent physical conditions which may affect the cost,progress, or performance <br /> of the work that the Contractor considers necessary to assure construction of the Project at the <br /> contract price within the contract time and in accordance with the Contract Documents, and no <br /> additional examinations, investigations, tests, reports, or other similar information will be <br /> required by the bidder for these purposes; <br /> d) The Contractor has reviewed all information in the Contract Documents with respect to <br /> existing underground facilities at or near the Project site, and the Contractor assumes <br /> responsibility for the exact nature and location of these underground facilities; and no <br /> additional examinations, investigations, tests, reports, or similar information will be required <br /> by the Contractor in order to construct the Project at the contract price within the contract time <br /> and in accordance with the Contract Documents, including Section 3.04 of the General <br /> Rev 08.17.2022 OC-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.