My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2024-232 approving the award of a construction contract to The Pounds Group, LLC dba Sullivan Contracting Services, through the Choice Partners Contract Cooperative Purchasing Program, f
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2024
>
Res 2024-232 approving the award of a construction contract to The Pounds Group, LLC dba Sullivan Contracting Services, through the Choice Partners Contract Cooperative Purchasing Program, f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2025 10:34:24 AM
Creation date
12/12/2024 11:18:34 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2024-232
Date
12/3/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID:93FC6755-9FA5-454A-A04A-E12501A62B54 <br /> OWNER-CONTRACTOR AGREEMENT <br /> STATE OF TEXAS <br /> COUNTY OF HAYS <br /> This Agreement (this "Agreement") is entered into by and between The City of San <br /> Marcos, a municipality in the State of Texas ("Owner"), and The Pounds Group, LLC dba Sullivan <br /> Contracting Services, 2299 Rudeloff Rd. East, Seguin, TX 78155, ("Contractor"), and is effective for <br /> all purposes as of the date of the last signature to this Agreement("Effective Date"). <br /> Section 1. The Contractor agrees to commence, carry out, and complete all work for the <br /> construction of the Project for the Contract Amount of one hundred,forty-three thousand,one hundred <br /> and one dollars, and forty-four cents ($143,101.44) and within the Contract Time, in accordance with <br /> the Contract Documents. <br /> Section 2. The Owner agrees to pay the Contractor for the satisfactory performance of the Contract <br /> in accordance with the amount agreed to herein for all Work in accordance with the Bidding and Contract <br /> Documents, Project Manual, Drawings, and Addenda, which are incorporated herein by reference and <br /> described in Article 2 of the General Conditions which constitute the Contract between the Owner and the <br /> Contractor. Any unit prices contained in the Bid Form will apply to this Contract in case of subsequent <br /> quantity adjustments for work items. <br /> Section 3. The Contractor agrees to commence work by the project start date set in the Notice to <br /> Proceed, to finally complete and achieve final acceptance of the Project within the number of days <br /> specified in the Project Schedule on PS-1 which is incorporated by reference into this Owner-Contractor <br /> Agreement, subject to extensions of time as provided in the Contract Documents. Time is of the essence <br /> of this Agreement, and the Contractor acknowledges that the Owner will be damaged if the Contractor <br /> fails to complete the Project on time and in accordance with the Contract Documents. The Contractor <br /> agrees to ensure that workers' compensation insurance coverage will be provided for all persons employed <br /> on the Project. <br /> Section 4. The Contractor makes the following representations in order to enter into this <br /> Agreement with the Owner: <br /> a) The Contractor has examined, read, and understands the Contract Documents; <br /> b) The Contractor is familiar with the Project area and site, and all local, state, and federal laws <br /> and regulations that in any manner may affect cost,progress, or performance of the work; <br /> c) The Contractor has made and studied the results of examinations, investigations, and tests of <br /> subsurface and latent physical conditions which may affect the cost,progress, or performance <br /> of the work that the Contractor considers necessary to assure construction of the Project at the <br /> contract price within the contract time and in accordance with the Contract Documents, and no <br /> additional examinations, investigations, tests, reports, or other similar information will be <br /> required by the bidder for these purposes; <br /> d) The Contractor has reviewed all information in the Contract Documents with respect to <br /> existing underground facilities at or near the Project site, and the Contractor assumes <br /> responsibility for the exact nature and location of these underground facilities; and no <br /> additional examinations, investigations, tests, reports, or similar information will be required <br /> by the Contractor in order to construct the Project at the contract price within the contract time <br /> Rev 08.17.2022 OC-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.