My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-001 approving On-Call Professional Services Agreements with Plummer Associates, Inc., Colliers Engineering and Design, Inc., Utility Engineering Group, PLLC, and Capitol Environmental for Stormwater Pollution Prevention Consulting Services
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-001 approving On-Call Professional Services Agreements with Plummer Associates, Inc., Colliers Engineering and Design, Inc., Utility Engineering Group, PLLC, and Capitol Environmental for Stormwater Pollution Prevention Consulting Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 7:54:00 PM
Creation date
1/13/2025 4:47:50 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-001
Date
1/7/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID:8EB6DDAC-ED8E-4C5E-8B6E-93915DB01 CF6 <br /> Materials Other Than Iron or Steel <br /> CDBG&RHP Programs All Other Covered CPD Programs <br /> Specifically Listed The BAP will apply to FY2024 The BAP will apply to funds from all <br /> Construction Materials and subsequent CDBG and other Covered CPD programs <br /> (Non-Ferrous Metals, RHP awards used to purchase obligated on or after August 23,2024, <br /> Lumber, Composite specifically listed construction used for the purchase of specifically <br /> Building Materials, materials as well as to purchase listed construction materials as well as <br /> Plastic and Polymer iron and steel. iron and steel for infrastructure <br /> Based Pipe and Tube) projects. <br /> The BAP will apply to FY2025 The BAP will apply to all Covered <br /> and subsequent CDBG and CPD program (except CDBG and <br /> Not Listed RHP awards used to purchase RHP)funds obligated on or after <br /> Construction Materials not listed construction materials August 23, 2024,used for the purchase <br /> for infrastructure projects. of not listed construction materials, as <br /> well as specifically listed construction <br /> materials and iron and steel, for <br /> infrastructure projects. <br /> The BAP will apply to FY2025 The BAP will apply to all Covered <br /> and subsequent CDBG and CPD program funds (except CDBG <br /> Manufactured RHP awards used to purchase and RHP) obligated on or after August <br /> Products manufactured products as well 23, 2024,used for the purchase of <br /> as specifically listed manufactured products for <br /> construction materials and iron infrastructure projects. <br /> and steel, for infrastructure <br /> projects. <br /> Applying the BAP and HUD Waivers to CPD Programs <br /> Once the BAP applies to an infrastructure project, a grantee must: <br /> 1. Comply with the BAP, or <br /> 2. Utilize one of HUD's general waivers, or <br /> 3. Obtain a project-specific waiver to exclude the project from the BAP. <br /> As a part of its record keeping, a CPD grantee should document its process to analyze if the <br /> BAP applies to a project using the approach below: <br /> Step 1: Type of proiect/activity <br /> Are the funds being used for an infrastructure project, as defined by BABA and explained in this <br /> notice? <br /> • If yes,proceed to step 2. <br /> • If no, the BAP does not apply. The BAP only applies to infrastructure projects. <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.