My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-031 approving a fifth amendment to the Amended and Restated Interconnection Agreement with the Lower Colorado River Authority (“LCRA”) Transmission Services Corporation
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-031 approving a fifth amendment to the Amended and Restated Interconnection Agreement with the Lower Colorado River Authority (“LCRA”) Transmission Services Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:24:28 PM
Creation date
3/17/2025 11:24:12 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-031
Date
3/7/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FIFTH AMENDMENT <br /> FACILITY SCHEDULE NO. 5A <br /> 1. Name: Redwood <br /> 2. Facility Location: The Redwood substation is located at 1375 Wonder World Drive, San <br /> Marcos, Hays County,Texas. <br /> 3. Points of Interconnection: There are a total of twelve (12) points of interconnection at <br /> Redwood substation generally described as: <br /> 3.1 where the 138 kV transformer bus connects to Operating Bus #1 for PWT-2. <br /> 3.2 where the 138 kV transformer bus connects to Operating Bus #2 for PWT-2. <br /> 3.3 where the incoming distribution line connects to the tubular bus between switches RW- <br /> 321 and RW-323 at breaker RW-320. <br /> 3.4 where the jumper from breaker RW-320, passing through CT-15, connects to the 4 <br /> hole pad on switch RW-319. <br /> 3.5 where the jumper from breaker RW-320 connects to the 4 hole pad on switch <br /> RW-321. <br /> 3.6 where the incoming distribution line connects to the tubular bus between switches RW- <br /> 341 and RW-343 at breaker RW-340. <br /> 3.7 where the jumper from breaker RW-340, passing through CT-11, connects to the 4 <br /> hole pad on switch RW-339. <br /> 3.8 where the jumper from breaker RW-340 connects to the 4 hole pad on switch RW- <br /> 341. <br /> 3.9 where the jumper from switch RW-202 connects to the 12.5 kV Operating bus for <br /> PWT-2,T-2. <br /> 3.10 where the jumper from switch RW-205 connects to the 12.5 kV Transfer bus for <br /> PWT-2,T-2. <br /> 3.11 where the jumper from switch RW-102 connects to the 12.5 kV Operating bus for <br /> PWT-2, T-2. <br /> 3.12 where the juniper from switch RW-105 connects to the 12.5 kV Transfer bus for <br /> PWT-2, T-2. <br /> 4. Transformation Services Provided by LCRA TSC: Yes for PWT-3, T-3 only, per <br /> separate Transformation Service Agreement <br /> 5. Metering Services Provided by LCRA TSC: Yes, per separate Wholesale Metering <br /> Service Agreement <br /> 6. Delivery Voltage: 138 kV for PWT-2; 12.5 kV for PWT-3 <br /> 7. Metered Voltage and Location: The metered voltage is 12.5 kV. The metering current <br /> transformers are located in each individual bay. The metering potential transformers are <br /> located on the 12.5 kV operating buses. <br /> 8. One Line Diagram Attached: Yes <br /> Fifth Amendment to the Interconnection Agreement between LCRA TSC and SMTXU Page 4 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.