My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-031 approving a fifth amendment to the Amended and Restated Interconnection Agreement with the Lower Colorado River Authority (“LCRA”) Transmission Services Corporation
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-031 approving a fifth amendment to the Amended and Restated Interconnection Agreement with the Lower Colorado River Authority (“LCRA”) Transmission Services Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:24:28 PM
Creation date
3/17/2025 11:24:12 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-031
Date
3/7/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
12.2 LCRA TSC will provide SMTXU access to 125 VDC and 120 VAC power. <br /> Circuits must have over current protection devices(OCPD) sized according to NEC <br /> standards. Panel boards containing the OCPD may belong to either SMTXU (if <br /> space is available)or LCRA TSC. <br /> 12.3 LCRA TSC will provide SMTXU with floor space (as available and as necessary)in <br /> its control houses for the installation of SMTXU required relay panel boards and <br /> equipment. <br /> 12.4 LCRA TSC will provide tripping and close inhibit contacts from LCRA TSC's 138 <br /> kV differential & breaker failure relaying panel to SMTXU's circuit switcher <br /> CS8235 relaying panel. <br /> 12.5 SMTXU will provide breaker failure initiate contacts from SMTXU's 138 kV circuit <br /> switcher CS8235 relaying panel to LCRA TSC's 138 kV bus differential &breaker <br /> failure relaying panel. <br /> 12.6 SMTXU will supply and provide relaying current transformers from SMTXU's <br /> Transformer T2 for use by LCRA TSC in LCRA TSC's 138 kV bus differential <br /> relaying scheme. <br /> 12.7 LCRA TSC and SMTXU shall design, provide, and coordinate their respective <br /> protection system equipment so that adjacent zones of protection overlap, in <br /> accordance with ERCOT Nodal Operating Guides. <br /> 12.8 LCRA TSC will make reasonable efforts to notify SMTXU in advance of any <br /> planned repairs or updates to LCRA TSC's system that may result in a temporary <br /> outage of the electrical operations on the SMTXU side of the Redwood substation. <br /> 13. Project Responsibilities: <br /> 13.1 Project Name: Redwood Substation Addition <br /> 13.2 Projected In-Service Date(s): May 15,2025 <br /> 13.3 Project Costs: Each Party will be responsible for all costs incurred in connection with <br /> the design,procurement,and construction activities for the facilities it owns. <br /> -----The remainder of this page has intentionally been left blank----- <br /> FifthAmendment to the Interconnection Agreement between LCRA TSC and SMTXU Page 6 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.