My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2025 11:02:36 AM
Creation date
7/14/2025 4:15:49 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-125
Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: DA4FA5BF-D9AF-4543-AD49-B8F98E2726F6 <br /> DBIA ContractDocument <br /> Progressive Design- <br /> Build Agreement for <br /> M <br /> Water and Wastewater <br /> Projects <br /> This Progressive Design-Build Agreement has been developed in <br /> conjunction with and endorsed by the Water Collaborative Delivery <br /> Association. <br /> Water Collaborative <br /> Delivery Association <br /> Better Projects, Together. <br /> Document No. 545 D811A <br /> Second <br /> o Design-Build Institute of America & MW <br /> Washington, <br />
The URL can be used to link to this page
Your browser does not support the video tag.