My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2025 11:02:36 AM
Creation date
7/14/2025 4:15:49 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-125
Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: DA4FA5BF-D9AF-4543-AD49-B8F98E2726F6 <br /> Appendix A-Basis of Design <br /> Table 2-4 Anticipated TPDES Permit MCLs <br /> Effluent Expected MCL <br /> Characteristic (mg/L) <br /> CBOD5 10.0 <br /> TSS 5.0 <br /> NH3-N 2.0 <br /> DO 4.0 <br /> TP 0.5 <br /> 2.4 Regulatory Compliance <br /> The selected DB firm will be responsible for coordinating with all applicable federal,state,county,City <br /> of San Marcos,and other governmental and regulatory agencies as required for project completion. <br /> Environmental assessments for the project site are currently being conducted by others,and the DB <br /> will need to accommodate any applicable regulatory requirements into their design and construction <br /> standards. <br /> 2.5 Resiliency <br /> The DB will consider the resiliency of all facility processes,structures,and equipment in the design of <br /> all project components. <br /> 2.6 Reuse <br /> The DB will consider the potential for reuse of treated wastewater effluent for uses both inside and <br /> outside the Facility.This potential may include: direct or indirect potable reuse to supplement the <br /> City's water supplies; Type 1 or 2 reclaimed water as defined by TCEQ to reduce potable water <br /> demands; and,the reuse of treated wastewater effluent for the internal plant use.The DB will be <br /> responsible for all submittals to TCEQ that are necessary to obtain an authorization through 30 TAC <br /> Chapter 210 Use of Reclaimed Water,if this option is chosen by the City. <br /> ARDURRA 2-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.