My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2025 11:02:36 AM
Creation date
7/14/2025 4:15:49 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-125
Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: DA4FA5BF-D9AF-4543-AD49-B8F98E2726F6 <br /> Progressive Design-Build Agreement <br /> for Water and Wastewater Projects <br /> This document has important legal consequences. Consultation with <br /> an attorney is recommended with respect to its completion or modification. <br /> This AGREEMENT is made as of the 2nd day of July in the year of 2025, by and between the following parties, for <br /> services in connection with the Project identified below: <br /> OWNER: <br /> The City of San Marcos, Texas <br /> Purchasing &Contracting Division <br /> 630 East Hopkins Street <br /> San Marcos, Texas 78666 <br /> DESIGN-BUILDER: <br /> Burns & McDonnell Engineering Company, Inc. <br /> Bridgepoint Building 4 <br /> 6200 Bridge Point Parkway <br /> Austin, TX 78730 <br /> PROJECT: <br /> FM 1978 Water Reclamation Facility Progressive Design-Build Project <br /> In consideration of the mutual covenants and obligations contained herein, Owner and Design-Builder agree as set <br /> forth herein. <br /> DBIA Document No.545 Page 1 <br /> Progressive Design-Build Agreement for Water and Wastewater Projects <br /> ©2022 Design-Build Institute of America <br />
The URL can be used to link to this page
Your browser does not support the video tag.