My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-125 approving a contract with Burns & McDonnell Engineering Company, Inc. to provide Phase 1, Progressive Design-Build Services for the design of the FM 1978 Water Reclamation Facility project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2025 11:02:36 AM
Creation date
7/14/2025 4:15:49 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-125
Date
7/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: DA4FA5BF-D9AF-4543-AD49-B8F98E2726F6 <br /> Figure 1. Phase 1 Target Timelines <br /> 'Task Activity Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 ##### Jan-26 Feb-26 Mar-26 Apr-26 ##### Jun-26 Jul-26 Aug-26 Sep-26 act-26 Nov-26 <br /> Task2 Notice to Proceed 1 Project Management <br /> Task 5 Survey and Field Investigations <br /> Task? Preconstruction Services Legend <br /> -Project Management <br /> Temporary Systems <br /> Task 1 Options Vetting&Selection 0-Phase 1 Activity <br /> Task 1 Design of Selected Option <br /> Task 8 GMP No.1 Proposal Development(Pump&Haul) <br /> Task4 TCEQ GMP No.1 Plan&Spec Approval(60%Set) <br /> Permanent FM 197E WRF <br /> Task 3 Options Analysis and Workshop <br /> Task Alternatives Analysis <br /> Task6 Preliminary Design(30%) <br /> Task6 Prefinal Design(60%) <br /> Task 8 GMP No.2 Proposal Development(Early Works Package) <br /> Task4 TCEQ GMP No.2 Plan&Spec Initial Review(60%Set) <br /> Task 8 GMP No.3 Proposal Development(Balance of Plant) <br /> Task4 TCEQ GMP No.3 Plan&Spec Initial Review(60%Set) <br /> 18 Exhibit B — Phase 1 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.