My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2025-161 approving a change in service to the contract with HDR Engineering, Inc., to increase contract capacity and scope to allow the city to expedite the emergency rehabilitation design of the Cape Road Bridge
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2025
>
Res 2025-161 approving a change in service to the contract with HDR Engineering, Inc., to increase contract capacity and scope to allow the city to expedite the emergency rehabilitation design of the Cape Road Bridge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 4:37:08 PM
Creation date
9/10/2025 4:37:05 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2025-161
Date
9/2/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION NO. 2025-161R <br /> A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN <br /> MARCOS, TEXAS APPROVING A CHANGE IN SERVICE TO THE <br /> CONTRACT WITH HDR ENGINEERING, INC., TO INCREASE <br /> CONTRACT CAPACITY AND SCOPE TO ALLOW THE CITY TO <br /> EXPEDITE THE EMERGENCY REHABILITATION DESIGN OF THE <br /> CAPE ROAD BRIDGE IN THE AMOUNT OF$601,000.00;AUTHORIZING <br /> THE CITY MANAGER, OR HER DESIGNEE, TO EXECUTE THE <br /> CHANGE IN SERVICE ON BEHALF OF THE CITY; AND DECLARING <br /> AN EFFECTIVE DATE. <br /> BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SAN MARCOS, <br /> TEXAS: <br /> PART 1. A Change in Service, number one (0),to the contract with HDR Engineering, <br /> Inc. (Contract No. 223-289), to increase contract capacity and scope to allow the City to expedite <br /> the emergency rehabilitation design of the Cape Road Bridge in the amount of $601,000.00 is <br /> approved. <br /> PART 2. The City Manager, or her designee, is authorized to execute the Change in <br /> Service on behalf of the City. <br /> PART 3. This resolution will be in full force and effect immediately from and after its <br /> passage. <br /> ADOPTED on September 2, 2025. <br /> 6 -yj <br /> Jane Hughson <br /> Mayor <br /> Attest: <br /> Elizabeth Trevino <br /> City Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.