Laserfiche WebLink
W BAKER-41GKLEN <br />& ASSOCIAL-11-ES. INC. <br />jinainawrs/Surviqyora <br />• <br />TSPE No,:F-45, TLSF No.: 100231 <br />Buie Tract Development <br />November 2009 <br />9.41-Ac, Annexation Tract Preliminary Water Demands <br />TYPL- Of Use: <br />Single Family <br />I <br />SUidwelfing unit <br />Multi-Family <br />0.66 <br />SU dwelling unit <br />Office <br />0.0002 <br />SUISquarc fool of b;j'klding area <br />Retail <br />0.001 <br />SUIsquare foot of building area <br />leverage Maximum <br />Building Area <br />Day Day <br />Dwelling Square <br />Demand Demand Peak How <br />Tract No. <br />Units Footage <br />SU (gpm) (gpm) Demand (gpm) <br />9A i Acre Multi-Family Annexation <br />Tract <br />1,12 Om <br />74 17.74 52 88-• <br />• <br />Phase 1 Total - Preliminary Water Demands <br />Average r4 a)d rn L, m <br />Building Area Day Day <br />Dwelling Square Demand Demand Peak Hour <br />Tract' No- Units Footage— SU WPM) (g PM) Demand (gpm) <br />Phase 1 tylutti-Family and lVixed Use <br />Development <br />71.•13 209 358.8 <br />pf"Ase 1 Retail 0 43,500 44 10,44 30 52.2 <br />Phase 1 Office 0 47,405 9 2.28 7 11.4 <br />Totals- 453 90,905 352 94.47 246 422 <br />'13Fsed upon City of San Marcos Water Sy-mern Design Criteria dated 2[3f04- <br />"Fire Flox and Irrigation demands have not been included. <br />""Based upon Preliminary Conceptual Lard Use Pian - Nji.xed Use I (Prepared by Baker-Aicklen d Asso�ates, dated August 28, 2009). <br />F <br />7K <br />PF-R or <br />AK U <br />................ <br />C 5 <br />k EN ........ <br />