Laserfiche WebLink
Docusign Envelope ID: BB4FCDA1-A564-4=-13116-E72FBD797168 <br />The CONSULTANT team, after preparing the model, will then: <br />• Code the additional roadways within the City modeling boundaries and the <br />new centroid connectors associated with the split TAZs. <br />• Incorporate the socio-demographic information from the City into the TAZ <br />geographic file input into the model. <br />The CONSULTANT team will calibrate the existing model so that assigned <br />volumes in the base year match available 2025 counts. Calibration may require <br />revisiting facility and area type classifications, factoring trip generation trip rates, <br />as well as post -processing model outputs for the base year. <br />The CONSULTANT team will refer to FHWA acceptable ranges for volume to <br />count ratios to determine how closely assigned volumes match observed traffic <br />counts. The model calibration step may require building a post -processor which <br />adjusts forecast year volumes based on base year validation metrics. The post - <br />processor will follow NCHRP methods to post -process traffic volumes. <br />The CONSULTANT expects to receive the following data to undertake the <br />calibration of the model: <br />• A working base model (CAMPO) <br />• Land use forecasts (City) <br />• Network improvements (City and from TMP development) <br />• Traffic counts (City, TxDOT, and select counts as described in Task 3.3) <br />The CONSULTANT will NOT conduct any primary or secondary data collection. <br />Deliverables: Base and Forecast Year Travel Demand Models <br />4.2 Travel Demand Model Scenario Planning <br />With oversight from the CONSULTANT team will run a total of five (5) scenarios <br />on the Existing and Forecast Year models and extract performance measures for <br />each run. The scenarios will include: <br />• Existing Condition (2025) <br />• Intermediate year model with 2035 forecasted traffic volumes excluding any <br />programmed projects (2050 NO BUILD) <br />• Intermediate year model with 2035 forecasted traffic volumes representing the <br />updated TMP prioritized projects (2035 BUILD) <br />• Forecast year model with 2050 forecasted traffic volumes excluding any <br />programmed projects (2050 NO BUILD) <br />• Forecast year model with 2050 forecasted traffic volumes representing the all <br />updated TMP projects (2050 BUILD) <br />The CONSULTANT team will provide documentation regarding the model <br />preparation and calibration process as well as performance measures extracted in <br />support of the TMP. <br />Deliverables: Model Scenarios, Model Scenario Outputs, Model Documentation <br />City of San Marcos Kimley-Horn and Associates, Inc. <br />TMP Exhibit B Scope of Services Page 12 August 21, 2025 <br />