My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2026-011 approving a Construction Contract with Sullivan Contracting Services, through Choice Partners Cooperative Contract, for construction services related to the Public Services Center Crew building
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2026
>
Res 2026-011 approving a Construction Contract with Sullivan Contracting Services, through Choice Partners Cooperative Contract, for construction services related to the Public Services Center Crew building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2026 11:16:30 AM
Creation date
1/30/2026 2:06:49 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2026-011
Date
1/20/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID: D4091 E92-9702-498B-A100-583A798AE2134 <br />OWNER -CONTRACTOR AGREEMENT <br />Public Services Complex Crew Offices Renovation, #2025-024 <br />STATE OF TEXAS <br />COUNTY OF HAYS <br />This Agreement (this "Agreement") is entered into by and between The City of San <br />Marcos, a municipality in the State of Texas ("Owner"), and The Pounds Group, LLC dba Sullivan <br />Contracting Services, 2299 Rudeloff Rd. East, Seguin, TX, 78155, ("Contractor"), and is effective for <br />all purposes as of the date of the last signature to this Agreement ("Effective Date"). <br />Section 1. The Contractor agrees to commence, carry out, and complete all work for the <br />construction of the Project for the Contract Amount of one hundred, seventy thousand, four hundred, <br />eighty dollars and 84/100s ($170,480.84) and within the Contract Time, in accordance with the Contract <br />Documents. <br />Section 2. The Owner agrees to pay the Contractor for the satisfactory performance of the Contract <br />in accordance with the amount agreed to herein for all Work in accordance with the Bidding and Contract <br />Documents, Project Manual, Drawings, and Addenda, which are incorporated herein by reference and <br />described in Article 2 of the General Conditions which constitute the Contract between the Owner and the <br />Contractor. Any unit prices contained in the Bid Form will apply to this Contract in case of subsequent <br />quantity adjustments for work items. <br />Section 3. The Contractor agrees to commence work by the project start date set in the Notice to <br />Proceed, to finally complete and achieve final acceptance of the Project within the number of days <br />specified in the Project Schedule on PS-1 which is incorporated by reference into this Owner -Contractor <br />Agreement, subject to extensions of time as provided in the Contract Documents. Time is of the essence <br />of this Agreement, and the Contractor acknowledges that the Owner will be damaged if the Contractor <br />fails to complete the Project on time and in accordance with the Contract Documents. The Contractor <br />agrees to ensure that workers' compensation insurance coverage will be provided for all persons employed <br />on the Project. <br />Section 4. The Contractor makes the following representations in order to enter into this <br />Agreement with the Owner: <br />a) The Contractor has examined, read, and understands the Contract Documents; <br />b) The Contractor is familiar with the Project area and site, and all local, state, and federal <br />laws and regulations that in any manner may affect cost, progress, or performance of the work; <br />c) The Contractor has made and studied the results of examinations, investigations, and tests <br />of subsurface and latent physical conditions which may affect the cost, progress, or performance of the <br />work that the Contractor considers necessary to assure construction of the Project at the contract price <br />within the contract time and in accordance with the Contract Documents, and no additional examinations, <br />investigations, tests, reports, or other similar information will be required by the bidder for these <br />purposes; <br />d) The Contractor has reviewed all information in the Contract Documents with respect to <br />existing underground facilities at or near the Project site, and the Contractor assumes responsibility for <br />the exact nature and location of these underground facilities; and no additional examinations, <br />investigations, tests, reports, or similar information will be required by the Contractor in order to <br />construct the Project at the contract price within the contract time and in accordance with the Contract <br />Rev 08.17.2022 OC-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.