My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2008-078
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2008
>
Res 2008-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 4:39:12 PM
Creation date
6/11/2008 9:46:27 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2008-78
Date
6/3/2008
Volume Book
176
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
responsibility for the materials. <br />1.0.6 Consultant will perform all of its services in coordination with the City. The Consultant <br />will advise the City of data and information the Consultant needs to perform its services and the <br />Consultant will meet with City representatives at mutually convenient times to assemble this data <br />and information. <br />1.1 TASK I — CONCEPT DEVELOPMENT <br />The Consultant will: <br />1.1.1 Review existing conditions at the Project site to determine the condition of the existing <br />tennis Court facility and to verify base map information gathered to date. <br />1. 1.2 Refine the proposed design based on this site evaluation and discussions with City staff in <br />order to finalize the programming, layout and space requirements necessary for the proposed <br />Project within context of the Rio Vista Park Site. The Engineer will also evaluate the Project in <br />accordance with the terms of the San Marcos River Corridor Ordinance. <br />1. 1.3 Prepare preliminary construction cost estimates for review and approval by the City. <br />1.1.4 Attend a pre - development meeting as organized by the City to review development issues <br />and Project procedures. <br />1.2 TASK 2 -- TOPOGRAPHIC SURVEY <br />The Consultant will: <br />1.2.1 The project team will prepare a topographic survey for the proposed Project area. The <br />approximately two -acre area and limits of the survey are shown on the attached map (Attachment <br />A). <br />1.2.2 Provide the final survey to the City in digital format in one --foot contour intervals. <br />1.3 TASK 3 — GEOTECHNICAL INVESTIGATION <br />The Consultant will: <br />1.3.1 The design team will provide the City of San Marcos with a geotechnical report for the <br />Project to include seven (7) —15' deep borings. In addition the Consultant will provide design <br />recommendations for paving, foundation, and other structural improvements. <br />1.4 TASK 4 -- CONSTRUCTION DOCUMEENTS PREPARATION <br />Land Design- Tennis Courts Agreement <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.