Laserfiche WebLink
• <br />• <br />BID TABULATION <br />Comanche Wastewater Improvements <br />November 19, 2009 at 2:00 P.M. <br />IFB 210-003 <br /> <br /> Addendum Bid <br />BIDDER NAME Total Bid #1,#2,#3 Bond SBQ <br />Rockin Q Construction LLC <br />288.00 <br />$91 <br />?l <br />San Marcos, TX , <br />Austin Engineering Co. Inc. <br />$153 <br />002.00 <br /> <br />?l <br />Austin, <br />TX , <br />Smith Contracting Co. Inc. $104 <br />444.00 <br />Austin, TX , <br />Central Texas Utility Services LLC $132 <br />492.00 <br />Del Valle, TX , <br />Austin Caylor Utilities LLC <br />$122 <br />964.00 <br />San Antonio, TX , <br />Haley Nelson Construction LLC $81,778.00 <br />Marble Falls, TX <br />Prism Development Inc. $179 <br />707.50 ?l <br />Austin, TX , <br />D. Shaffer Concrete Co. Inc. <br />$141 <br />763.90 <br />1 & 2 <br />Pflu erville, TX , <br />Lowden Excavating Inc. $143 <br />618.92 <br />Kyle, TX , <br />- <br />Du-Mor Enterprises, Inc. $$9 <br />436.00 <br />San Antonio, TX , <br />``- f? <br />WITNESSED BY: y <br />v <br />9 <br />