Laserfiche WebLink
Docusign Envelope ID: D7DF5AE1-3343-8771-83F4-5155BFB7D229 <br /> ON-CALL GEOTECHNICAL ENGINEERING AND CONSTRUCTION <br /> MATERIALS TESTING CONSULTING SERVICES <br /> CITY OF SAN MARCOS <br /> RABA KISTNER CONSULTANTS,INC. <br /> FIELD DRILLING SERVICES <br /> UNIT 2026 PRICE <br /> -1 Auger Drilling(Does not include logging) <br /> soil per ft $ 21.99 <br /> soft rock per ft $ 26.63 <br /> -2 Standard Wet Rotary(Does not include logging) per ft $ 30.10 <br /> -3 Nx Rock Core(Does not include logging) <br /> Soft rock(marl,shale) per ft $ 43.99 <br /> Hard rock(limestone,sandstone) per ft $ 57.88 <br /> -4 Non-conventional drilling(barge drilling or unusual time <br /> consuming drilling i.e.through bridge) per hr $ 390.12 <br /> -5 Field Logging Services <br /> Geotechnical Technician per hr $ 84.51 <br /> Geologists per hr $ 165.00 <br /> Engineer in Training per hr $ 119.92 <br /> -6 Field Coordination <br /> Senior Geotechnical Technician per hr $ 95.51 <br /> Geotechnical Technician per hr $ 84.51 <br /> -7 Mobilization <br /> Mobilization or truck-mounted rig,rill crew and support per mile current GSA <br /> Field logger trip charge per mile current GSA <br /> Mobilization non-standard equipment(4x4 all terrain rig) cost+10 <br /> Barge mobilization and rental cost+10 <br /> Minimum Charge per day $ 963.14 <br /> -8 Sampling <br /> Standard Penetration Test(ASTM D1586) per test $ 31.26 <br /> Shelby Tube(ASTM D1587) per test $ 31.26 <br /> Texas Cone Penetrometer Test(THD,Tex-132-E) per test $ 35.89 <br /> -9 Other Expenses/Charges <br /> Standby Time per hr $ 310.24 <br /> Mileage-non-drilling equipment per mile current GSA <br /> Grout backfill per ft $ 4.82 <br /> Dozer/clearing cost cost+10 <br /> Logger truck charge perday $ 74.23 <br /> Standard pavement coring each $ 101.55 <br /> Concrete/AC patch each $ 86.63 <br /> Traffic control-signs,barricades cost+10 <br /> All other outside expenses cost+10 <br />