Laserfiche WebLink
• FY 2070 CAPITAL MOVEMENT PROJECTS • <br />Drainage Summarv <br />Project Cate o Brief Description <br /> Cert. Obli . <br />Hughson Heights Drainage $ 350,000 Routing storm flows to existing pond located on N. LBJ to reduce erosion & pollution in Sink Creek <br />Multiservice Center $ 1,150,000 Combined building to house W & WW, PW and electric to eliminate duplication and facilitate coordination. <br />S Bishop Street Improvements $ 268,180 Install storm sewer on S Bishop, Belvin and San Antonio with an outfall to Purgatory Creek <br />Stormwater Improvements $ 172,500 Systemwide improvements to address spot specific deficiencies and localized problems <br />Thorpe Lane Improvements $ 792,350 Construct improvements between Hopkins and drainage channel to address standing water and pavement failure problems <br /> $ 2,733,030 Total All Funding Sources <br />Electric Summary <br />Project Category Brief Description <br /> Cert. Oblig. <br />Ca acitor Procurement Pro ram <br />Circuit 3Wltchef Change out $ 15,000 <br />$ 300,000 Annual funding provides capacitor banks & controls for distrubution system owedactor correction, energy loss reduction & contin en needs. <br />Upgrade switcher to compley with NERC and ERCTITRE system reliability standards <br />Distribution Transformers <br />Ranch Road 12 Feeder RR 70 Upgrade $ 412,900 <br />$ 35,000 Purchase to serve new commercial, retail and residential subdivisions, and maintenance of existing <br />Addresses the reconductor of 4,100 feet of existing 336.4 thousand circluar mills to 795 thousand to serve the additional load development. <br />Reconductor 4/0 at Stone Campers $ 60,000 Reconductor in order to form a robust lieline with the future Cnayon substation feeder to be located west of 1-35. <br />Reconductor RR 12 Feeders $ 50,000 Double feeder capacity from RR12 Substation to Craddock Avenue to service additional load development <br />Redwood Feeder Reconfiguration Projects $ 82,000 The project addressed reconfiguration of the Redwood feeers to McCarty Lane Substation. <br />Replace SCADA System $ 200,000 Current system is out of date and run entirely on micro-processors, and requires replacement for changing technology <br />Street Light Replacement Program $ 413,000 Annual project to address new street light installations. <br />URD Maintenance $ 50,000 To fund emergency maintenance or replacement of underground electrical utilities. <br /> $ 1,617,900 Total All Funding Sources <br />Parks & Public Buildings Summary <br />Project Category Brief Description <br /> Cert. Obli . <br />Downtown Parking $ 300,000 Conduct detailed study of downtown parking, starter funds in 2010 for implementation <br />Girls Softball Complex $ 2,271,250 Construct fast pitch softball complex with 4 lit fields, concession/reslroom/dressing facility, etc, to host tournaments <br />Lucio Park $ 112,412 Replace pedestrian bridge, trail work, lighting, small parking lot, and construct on-street parking along CM Allen <br />Multiservice Center $ 1,150,000 Combined building to house W & W W, PW and electric to eliminate duplication and facilitate coordination. <br />PARD Equipment Storage $ 46,000 Storage facility for department equipment and supplies; current facility no longer available <br />Purgatory Creek Preserve $ 1,000,000 Park access, parking, trails. and other amenities including an education center <br />Rio Vista Park $ 211,600 Replace lighting, entry road, parking along CM Allen, basketball court, lighting, and trail work <br /> $ .5,091,262 Total All Funding Sources <br />Public Safe Summar <br />Project Category Cert. Obli Brief Description <br />Aerial Apparatus $ 750,000 This project in contingent upon the opening of Fire Station #5. Want to purchase a 75' aerial apparatus and required equipment. To meet Iso <br /> $ 750,000 Total All Funding Sources <br />Streets Summary <br />Project Category Brief Description <br /> Cert. Obli . <br />Loop 82 RR Overpass Post Realign $ 192,720 TxDOT project to construct railroad overpass on Loop 82/Aquarena Springs <br />Donaldson Street Imp <br />Thorpe Hopkins Imp $ 43,800 <br />$ 2,100,000 Construct street using existing ROW providing connection between Guadalupe and LBJ, improving access to Transit Center <br />Construct additional eastbound lane between Charles Austin and the RR to provide dual left turn lanes and two through lanes from Hopkins <br />Traffic Calming $ 28,750 Establish funding for traffic calming devices such as speed cushions, chicanes and diverters. <br />Traffic Signal Upgrade $ 287,500 Upgrad the traffic system to include pre-emption for emergency management vehicles on select major corridors <br /> $ 2,652,770 Total All Funding Sources