My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2026-109 Approving a Contract with Commservpros, LLC, through the Texas Interlocal Purchasing System for Fiber Installation from Redwood Electrical Substation
San-Marcos
>
City Clerk
>
03 Resolutions
>
2020's
>
2026
>
Res 2026-109 Approving a Contract with Commservpros, LLC, through the Texas Interlocal Purchasing System for Fiber Installation from Redwood Electrical Substation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2026 3:59:47 PM
Creation date
7/19/2026 11:51:56 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2026-109
Date
7/7/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Docusign Envelope ID:8BA0290E-DE15-8AE2-8050-4AD2E6486749 <br /> OWNER-CONTRACTOR AGREEMENT <br /> Fiber Route Redwood Sub & City Hall(COOP), #2026-063 <br /> STATE OF TEXAS <br /> COUNTY OF HAYS <br /> This Agreement (this "Agreement") is entered into by and between The City of San Marcos, a <br /> municipality in the State of Texas ("Owner"), and CommServPros LLC, PO BOX 19534, Austin, Tx <br /> 78760, ("Contractor"), and is effective for all purposes as of the date of the last signature to this <br /> Agreement("Effective Date"). <br /> Section 1. The Contractor agrees to commence, carry out, and complete all work for the <br /> construction of the Project for the Contract Amount of two hundred thirty-five thousand,eight hundred <br /> four dollars and fifteen cents ($235,804.15) and within the Contract Time, in accordance with the <br /> Contract Documents. <br /> Section 2. The Owner agrees to pay the Contractor for the satisfactory performance of the Contract <br /> in accordance with the amount agreed to herein for all Work in accordance with the Bidding and Contract <br /> Documents, Project Manual, Drawings, and Addenda, which are incorporated herein by reference and <br /> described in Article 2 of the General Conditions which constitute the Contract between the Owner and the <br /> Contractor. Any unit prices contained in the Bid Form will apply to this Contract in case of subsequent <br /> quantity adjustments for work items. <br /> Section 3. The Contractor agrees to commence work by the project start date set in the Notice to <br /> Proceed, to finally complete and achieve final acceptance of the Project within the number of days <br /> specified in the Project Schedule on PS-1 which is incorporated by reference into this Owner-Contractor <br /> Agreement, subject to extensions of time as provided in the Contract Documents. Time is of the essence <br /> of this Agreement, and the Contractor acknowledges that the Owner will be damaged if the Contractor <br /> fails to complete the Project on time and in accordance with the Contract Documents. The Contractor <br /> agrees to ensure that workers' compensation insurance coverage will be provided for all persons employed <br /> on the Project. <br /> Section 4. The Contractor makes the following representations in order to enter into this <br /> Agreement with the Owner: <br /> a) The Contractor has examined, read, and understands the Contract Documents; <br /> b) The Contractor is familiar with the Project area and site, and all local, state, and federal <br /> laws and regulations that in any manner may affect cost,progress, or performance of the work; <br /> c) The Contractor has made and studied the results of examinations, investigations, and tests <br /> of subsurface and latent physical conditions which may affect the cost, progress, or performance of the <br /> work that the Contractor considers necessary to assure construction of the Project at the contract price <br /> within the contract time and in accordance with the Contract Documents, and no additional examinations, <br /> investigations,tests,reports, or other similar information will be required by the bidder for these purposes; <br /> d) The Contractor has reviewed all information in the Contract Documents with respect to <br /> existing underground facilities at or near the Project site, and the Contractor assumes responsibility for <br /> the exact nature and location of these underground facilities; and no additional examinations, <br /> investigations,tests,reports, or similar information will be required by the Contractor in order to construct <br /> the Project at the contract price within the contract time and in accordance with the Contract Documents, <br /> including Section 3.04 of the General Conditions; <br /> Rev 08.17.2022 OC-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.