c) Erosion control standards. <br />1.3.11 Prepare a Construction Sequence and Traffic Control Plan ("TCP") to include: <br />a) The design of a conceptual traffic control plan based on Texas Manual on Uniform <br />Traffic Control Devices ("TxMUTCD") and the City guidelines. The Engineer will <br />provide one (1) conceptual traffic control design for review and approval by the City. <br />In addition, the Engineer will consider and implement input from TxState and other <br />affected parties as possible; and <br />b) Preliminary traffic control plan sheets based on approved conceptual design. The <br />Engineer will note modifications of conceptual design due to design considerations <br />will be noted in memorandum to the City for approval. <br />1.3.12 Prepare final TCP plan sheets based on the approved preliminary design to include: <br />a) Narrative of traffic control plan detailing phasing of construction; <br />b) TCP layouts, which will include lane closure locations, taper lengths, signing, <br />striping, typical sections and any other required information; <br />c) Detour layout for Peques realignment; <br />d) Traffic control summary of quantities; and <br />e) Traffic control standards. <br />1.3.13 Provide general notes and technical specifications based on TxDOT and City standard <br />specifications, special specifications, and special provisions and prepare new special provisions <br />or special specifications, as required. <br />1.3.14 Compute estimated quantities for all bid items and estimated cost of construction using <br />current average low bid unit prices from at least two sources. <br />1.3.15 Determine the number of calendar days allowed for the construction contract and prepare <br />a schedule identifying major work items, critical path items, production rates and estimated <br />construction time. Rates will be based on standard TxDOT rates of construction and approved <br />by the City. The Engineer will coordinate the schedule with the City and TxState to account for <br />traffic demands for the university and local residents. <br />1.3.16 Be responsible for the following miscellaneous items: <br />a) Upon City approval, modify City and TxDOT standards for Project application as <br />needed; <br />b) Provide final CD of all plan files and file name documentation as record of design <br />sent to construction; and <br />c) Submit 30%, 60%, and 100% plan sets and required documentation for each submittal <br />based on TxDOT's PS&E Manual guidelines located on TxDOT's website. <br />KBR-Sessom Drive Roadway Improvements Agreement <br />