Laserfiche WebLink
<br />55 <br /> <br />TEXAS Thr.FFIC SAFETY PROGRAM CO~ . RACT <br />STATE DEPARTMENT OF HIGHWAYS AND PUBLIC TRANIPORTATION <br />TRAFFIC SAFETY SECTION <br />AUITIN, TEXAS 78701 <br /> <br />I I I NATIONAL <br />~ 1 5 STANDARD <br />PROJECT NAME <br />Driver Behavior - Selective Enforcement <br />Cop.tractor: <br />:RlEF DESCRIPTION OF PROJECT CRIR DETAILS. SEE STATEMENT OF WORK) <br />To implement a Selective Traffic Enforcement Project (STEP) that will <br />apply additional enforcement effort at those locations, times of day and <br />days of the week against hazardous traffic violations at specifically <br />identified high accident locations. The additional enforcement effort <br />will be designed to impact the traffic accidents at those STEP sites. <br />GOALS To reduce accidents at STEP METHOD OF EVWATION fF()R DETAILS. SEE STATEMENT OF WORK) <br />sites during STEP hours. Administrative and Impact <br /> COlT CATECIOIIV AMOUNT <br /> TIIII ComnIct F....... V..,. T...I PNI8eI PROPOSED PROJECT PERIOD <br />PERSONAL SERVICES. . . . . . . . . . .. $57,372.34 $57,372.34 <br /> FADM 10-01-87 <br />CONTRACT SERVICES. . . . . . . . . . .. <br /> TO 09-30-88 <br />~~rrIES................... <br />OTHERDIRECTCOST..... ........ $ 5,200.00 $ ~200. 00 CON'IRACT PERIOD <br /> ENDS <br />INDIRECTCOST.................. <br />PROfIT ......................... 09-30-88 <br />TOTAL $62,572.34 $62,572.34 <br />YPE OF REllllURSEMENT 10URCØ OF FUNDS AMOUNT ~"IT LIMITS <br /> <br />. D LUMP SUM FEDERAL .C4.0.Z.l... $46,929.24 1. MAXIMUM AMOUNT E~IBM90~ <br /> REIMBURSEMENT $ , . 6 <br />D COST PER UNIT OF WORK GTSF................ 2. NO COST CATEGORY MAYBE EXCEEDED <br /> BY MORE THAN 5% OF THE CON. <br />D COST PLUS FIXED FEE TRACT TOTAL BUDGET <br />D SPECIFIC RATES 3. ONLY THOSE COStS INCURRED DURING <br /> THE CONTRACT PERIOD SHALL BE <br /> EUGIBLE FOR REIMBURSEMENT. <br />~ ACTUAl COST lOCAL .............. $15,643.10 THE CONTRACTOR MUST BEAR ALL COSTS <br /> NOT EUGIBLE FOR REIMBURSEMENT. <br />FOR DETAILS. SEE STATEMENT OF WORK TOTAL $62,572.34 <br />. THIS CONTRACT INCLUDES -L. ATTACHMENTS: <br /> 1. STATEMENT OF WORK 4. Operations Plans <br /> 2. GENERAL PROVISIONS <br /> 3. SPECIAL PROVISIONS <br />. FEDERAL AND STATE REGULATIONS AND GUIOEUNES SHALL BE THE BASIS FOR DETERMINING EUGIBIUTY OF COSTS <br /> <br />File 18.1~1 (rev. M4) <br />(Replaces TSS Fonn A3.0) <br /> <br />page , of 3 <br />