Laserfiche WebLink
<br />* <br /> <br />The level of capital improvements shown in Line 26 <br />represents a substantial reduction from levels in <br />this budget year reflecting slower economic <br />conditions. If econoEic conditions improve <br />resulting in more capital improvements, the level <br />of routine construction projects included therein <br />may need to be increased. <br /> <br />Schedule CITY-l shows the detail for the City portion of <br />the proposed City Budget. The following comments summarizes <br />the highlights of this budget: <br /> <br />* <br /> <br />As previously discussed, Purchased Power (Line 1) <br />is projected to increase an average of $109,482 per <br />month. <br /> <br />* <br /> <br />Total Data Processing costs (Line 7) are projected <br />to decrease an average of $992 per month. <br /> <br />* <br /> <br />Total Outside Services (Line 16) are projected to <br />decrease an average of $10,697 per month, or 39.1% <br />reflecting less need for outside assistance. The <br />only specific projects identified in the proposed <br />budget are $18,000 for auditing and $18,000 for an <br />internal cost allocation study. The balance of <br />$164,000 would be available for those outside <br />services specifically authorized by the Board <br />during the budget year, as required. <br /> <br />* <br /> <br />As previously discussed. Total Administrative and <br />General (Line 23) is projected to increase an <br />average of $6,199 per month to reflect more <br />accurate City labor allocations to SMEU. <br /> <br />* <br /> <br />As previously discussed, Debt Service (Line 25) is <br />projected to increase to $1,235,866 to include <br />principal and interest accruals for debt service <br />payments during the budget period. Also included <br />in this amount is an allowance of $2,991 for <br />transfer to the Debt Service Reserve Fund to comply <br />with the Bond Ordinance. <br /> <br />* <br /> <br />The proposed SMEU Budget includes $250,000 as an <br />accrual for transition costs (Line 23) for <br />purchasing LCRA substation facilities at the end of <br />the Operating Agreement. <br />