Laserfiche WebLink
<br />San M:arcos Electric Utility <br /> <br />Lower Colorado River Authority-Operating Agent <br />Post Office Box 788 San Marcos, Texas 78666 . (512) 396-2451 <br /> <br />Budget Overview <br />Fiscal Year 1987-88 <br /> <br />In accordance with the Operating Agreement between the Lower <br />Colorado River Authority (LCRA) and the City of San Marcos (City), <br />Article 2, Section 2.5, LCRA, Operating Agent for the City, is <br />submitting the following budget for the City's Fiscal Year 87-88. <br /> <br />The budget is presented in three main categories: <br /> <br />1. <br />2. <br /> <br />Operating Budget San Marcos District <br />Construction Budget <br /> <br />3. <br /> <br />Support Services, Austin LCRA. <br /> <br />The budget for FY 87-88 has been designed using the following <br />procedure: <br /> <br />1. <br /> <br />Analyzing expenses for the first five months of operations. <br />This analysis included gathering all actual costs as <br />recorded by LCRA's method of accounting; identifying <br />other expenses that occurred during this time period <br />but, through LCRAls method of accounting, will clear <br />at a later date; considering any vacancies in staff during <br />thi s time peri od that woul d effect projections; identi fy <br />all labor costs that would be' billed to SMEU but, through <br />LCRA's method of accounting, is not showing in actual <br />expense; consi der any cost that woul d effect projecti on, <br />that would normally be attributed to a monthly expense, <br />but remained with LCRA due to overlap between October <br />and November during takeover; considered any conditions <br />that were out of the ordinary which would effect <br />projection. <br /> <br />After expenses for the first 5 months were accumulated, <br />a twelve month projection was made. <br /> <br />2. <br /> <br />3. <br /> <br />If projection in some areas was not realistic, past trends <br />were considered, anticipated purchases reviewed and <br />adjustments were made to compensate. <br /> <br />Based on these projections and a basic 4.5% inflation <br />factor, the fiscal year 87-88 budget was derived. <br /> <br />4. <br />