Laserfiche WebLink
<br /><X.hb--.ncuL.'T~œ aE'l' ES".l".IImm <br /> <br />DMB: <br /> <br />October 21r 1981 <br /> <br />Item No. 1 <br /> <br />~: Recaostruct BrlstiJJq RmIIray 8-26 <br /> (~U&. 5r380') San HImxB ltmi,,-JpaJ <br /> Ab:part , San MIu:aJs , Texas <br />PJ:epIœd by: MiåIael IìynD 1txJœ, P .B. <br />Item No. Description Quantity Unit Cost AIoount <br />1 Embankment 7,500 C.Y. $4.50 $33,750 <br />2 Crushed Aggregate <br /> Make-Up Base 20,070 C.Y. $20.00 $401,400 <br />3 2 " ~ SUrface Course 12,090 Tons $30.00 $362,700 <br />4 Cold Mix Recycle <br /> Base Material 106,070 S.Y. $1.75 $185,623 <br />5 Bituminous Prime Coat 36,637 Gal. $1.15 $42,133 <br />6 Runway & Taxiway Painting 37,530 S.F. $0.55 $20,642 <br />7 Reroove & Replace <br /> Retroref1ecti ve Markers 24 Each $15.00 $360 <br />8 Lirre Treated SUbgrade 2,000 S.Y. $3.75 $7,500 <br />9 8" P\TC Underdrain Pipe 304 L.F. $7.00 $2,128 <br />10 8" PVC Drain Pipe 600 L.P. $5.50 $3,300 <br /> ---------- <br /> SUbtotal $1,059,536 <br /> Contingencies $105,954 <br /> ------- <br /> Total Construction Cost $1,165,490 <br />