Laserfiche WebLink
<br />those provided <br /> <br />for <br /> <br />in paragraph <br /> <br />1.3.1 hereof <br /> <br />as <br /> <br />a part <br /> <br />of Basic <br /> <br />Services. <br /> <br />1.6.3 <br /> <br />Preparation of applications for the necessary highway and <br /> <br />railroad <br /> <br />right-of-way <br /> <br />permits <br /> <br />and <br /> <br />highway <br /> <br />and <br /> <br />railroad <br /> <br />crossing <br /> <br />permits. <br /> <br />1.6.4 <br /> <br />Preparation and issuance of Addenda made necessary by OWNER's <br /> <br />requested changes or modifications which are inconsistent with written <br /> <br />approvals or instructions previously given or are due to other causes <br /> <br />not solely within ARCHITECT's control. <br /> <br />1.6.5 <br /> <br />Resident Project Representation beyond that provided as a <br /> <br />part of Basic Services. <br /> <br />1.6.6 <br /> <br />Providing any other services not otherwise included in this <br /> <br />Agreement or not customarily furnished in accordance with the standard <br />of care exhibited by large, national achitectural firms. <br /> <br />1.7 <br /> <br />TIME <br /> <br />1.7.1 <br /> <br />The ARCHITECT shall submit to the OWNER within 90 days of the <br /> <br />execution of this contract, the final construction contract documents, <br /> <br />plans and specifications. <br /> <br />As used herein the term "final" construction <br /> <br />contract documents, plans and specifications shall be interpreted to <br /> <br />mean the construction contract documents, plans and specifications as <br /> <br />reviewed and finally approved by the OWNER. <br /> <br />ARTICLE 2 <br /> <br />THE OWNER'S RESPONSIBILITIES <br /> <br />2.1 <br /> <br />The <br /> <br />OWNER <br /> <br />shall <br /> <br />provide <br /> <br />full <br /> <br />information <br /> <br />regarding <br /> <br />requirements <br /> <br />for <br /> <br />the <br /> <br />project(s). <br /> <br />Such <br /> <br />information <br /> <br />may <br /> <br />include <br /> <br />a <br /> <br />program, <br /> <br />which <br /> <br />shall <br /> <br />set <br /> <br />forth <br /> <br />the <br /> <br />OWNER's <br /> <br />design <br /> <br />objectives, <br /> <br />constraints and criteria, including space requirements and <br /> <br />'elationships, <br /> <br />flexibility and expandability, <br /> <br />special <br /> <br />equipment and <br /> <br />Jystems and site requirements. <br /> <br />2.2 <br /> <br />If the OWNER provides a budget for the project(s) <br /> <br />it shall <br /> <br />include <br /> <br />contingencies <br /> <br />for <br /> <br />bidding, <br /> <br />changes <br /> <br />in <br /> <br />the <br /> <br />Work <br /> <br />during <br /> <br />-9- <br />