Laserfiche WebLink
• • • <br />BID TABULATION <br />PROJECT: City of San Marcos Downtown ADA Improvements Project <br />OWNER: City of San Marcos <br />JOB NUMBER: 0323 -4 -026 <br />BID DATE: March 2, 2010 <br />PROJECT LOCATION: San Marcos Texas <br />D. Shaffer Concrete Co. Inc. Austin Calslmclurs, LLC. Prism Development, Inc G &P Contractors Inc. Relmcc Inc. I TCB Cosntruction Inc Myers Concrete Construction LP <br />Item_ uantt Unit 12g§gription Unit Price Amount Unit Price Amoun Unit Price Amoun Unit Price Amount Unit Price Amou Unit Price Amount Unit Prlco Amoun <br />1 1 EA Mobilization <br />$ 2,46130 <br />$ 2,46130 <br />$ 1,80000 <br />$ 1,800.00 <br />$ 5,000.00 <br />$ 5,00000 <br />$ 10,00000 <br />$ 10,000 .00 <br />$ 10,00000 <br />$ 10,00000 <br />$ 6,000.00 <br />$ 6,000.00 <br />$ 4,000.00 <br />$ 4,000.00 <br />2 70 CY Unclassified Excavation (including but <br />$ 8000 <br />$ 5,600.00 <br />$ 6000 <br />$ 4,200 00 <br />$ 4800 <br />$ 3,360.00 <br />$ 115.00 <br />$ 8,05000 <br />$ 7000 <br />$ 4,900.00 <br />$ 120.00 <br />$ 8,40000 <br />$ 5750 <br />$ 4,025.00 <br />not limited to saw culling and removing <br />HMAC and concrete, clearing and <br />grubbing, haul of excess, and <br />embankment), complete in place <br />3 138 LF Remove Curb & Gutter, complete ul <br />$ 500 <br />$ 690.00 <br />$ 1200 <br />$ 1,656.00 <br />$ 725 <br />$ 1,00050 <br />$ 600 <br />$ 82800 <br />$ 600 <br />$ 82800 <br />$ 5.00 <br />$ 690 W <br />S 20.00 <br />$ 2,76000 <br />Place <br />4 1,441 SF Remove Concrete Sidwalk and <br />$ 100 <br />S 1,441.00 <br />$ 600 <br />$ 8,64600 <br />$ 3.75 <br />$ 5,40175 <br />$ 300 <br />$ 4,32300 <br />$ 150 <br />$ 2,16150 <br />$ 2.00 <br />$ 2,882.00 <br />S 3.30 <br />$ 4,755.30 <br />Driveway, complete in place <br />5. 571 5F Concrete Sidewalk, 4" Thick, Including <br />$ 500 <br />$ 2.855.00 <br />$ 425 <br />$ 2,42675 <br />$ 3.50 <br />$ 1,99850 <br />$ 425 <br />$ 2,426.75 <br />$ 12,00 <br />$ 6,852.00 <br />$ 600 <br />$ 3,426.00 <br />S 8.60 <br />$ 4,910.60 <br />Excavation and Removal of <br />Obstructions, complete in place <br />6 1 FA Side Walk Ramp including truncated <br />$ 750,00 <br />$ 75000 <br />$ 1,200.00 <br />$ 1,20000 <br />$ 1,00000 <br />$ 1,000.00 <br />$ 850.00 <br />$ 850.00 <br />$ 2,500.00 <br />$ 2,50000 <br />$ 1,20000 <br />$ 1,200.00 <br />$ 1,200.00 <br />$ 1,20000 <br />domes (Parallel to Street), complete in <br />place <br />Actual - <br />7 2 FA Curb [Ramp with Double Flares <br />$ 75000 <br />$ 1,50000 <br />$ 90000 <br />$ 1,80000 <br />$ 1,20000 <br />$ 2,40000 <br />$ 1,00000 <br />$ 2,000.00 <br />$ 2,350.00 <br />S 4,700,00 <br />$ 1,000.00 <br />$ 2,000.00 <br />$ 1,45000 <br />$ 2,900.00 <br />(including truncated domes), complete <br />in place <br />Shown- <br />$ 1,000.00 <br />8. 3 EA Curb Ramp with Single Flares <br />$ 75000 <br />$ 2,25000 <br />$ 70000 <br />$ 2,10000 <br />$ 1,10000 <br />$ 3,30000 <br />$ 95000 <br />$ 2,850.00 <br />$ 1,95000 <br />S 5,850,00 <br />$ 900.00 <br />$ 2,700.00 <br />S 1,333.00 <br />$ 3,999.00 <br />(including truncated domes), complete <br />in place <br />9 10 FA <br />$ 75000 <br />$ 7,50000 <br />$ 50900 <br />$ 5,00000 <br />$ 90000 <br />$ 9,00000 <br />$ 90000 <br />$ 9,00000 <br />$ 1,65000 <br />$ 16,50000 <br />$ 90000 <br />$ 9,000.00 <br />$ 1,200.00 <br />$ 12,000.00 <br />Curb Ramp with no Flares (including <br />truncated domes), complete in place <br />10. 146 LF Curb & Gutter, complete in place <br />$ 1000 <br />$ 1.46000 <br />$ 1200 <br />$ 1,752.00 <br />$ 27 <br />$ 4,015.00 <br />$ 15.00 <br />$ 2,190 00 <br />$ 1800 <br />$ 2,628.00 <br />$ 21.00 <br />$ 3,066.00 <br />$ 33.00 <br />$ 4,818.00 <br />11. 17 EA Truncated Domes (including sawcutting <br />$ 36000 <br />S 5.95000 <br />$ 300.00 <br />$ 5,10000 <br />$ 35000 <br />$ 5.95000 <br />$ 35000 <br />$ 5,95000 <br />S 1,200 00 <br />S 20,400 00 <br />$ 40000 <br />$ 6.80000 <br />$ 69500 <br />$ 11,815 00 <br />existing concrete ramp, hard of excess), <br />complete in place <br />12. 1 LS Remove Existing Handrails, complete in <br />$ 25000 <br />$ 250.00 <br />$ 600.00 <br />$ 600.00 <br />$ 250.00 <br />$ 250.00 <br />$ 35000 <br />$ 350.00 <br />$ 60000 <br />$ 60000 <br />$ 60000 <br />$ 600.00 <br />$ 70000 <br />$ 700.00 <br />place <br />13 54 LF Handrails, including paint, complete in <br />$ 5000 <br />$ 2,70000 <br />$ 33.00 <br />$ 1,78200 <br />$ 9600 <br />$ 5,184.00 <br />$ 10500 <br />$ 5,67000 <br />$ 75.00 <br />S 4,05000 <br />S 8500 <br />$ 4,59000 <br />$ 52.00 <br />$ 2,808.00 <br />place <br />Actual - <br />14 32 LF Bick Paver Hoarder to match existing, <br />$ 10000 <br />$ 3,200.00 <br />$ 1600 <br />$ 512.00 <br />$ 860 <br />$ 27520 <br />$ 1600 <br />$ 512.00 <br />$ 40.00 <br />$ 1,280.00 <br />$ 4000 <br />$ 1,280.00 <br />$ 2500 <br />$ 800.00 <br />complete in place <br />Shown- <br />$ 27500 <br />15 40 SF Remove and Replace Brick Pavers to <br />$ 10 00 <br />$ 40000 <br />$ 11.50 <br />$ 460.00 <br />$ 1850 <br />$ 740.00 <br />$ 45.00 <br />$ 1,800.00 <br />$ 2000 <br />$ 800.00 <br />$ 30,00 <br />$ 1.200.00 <br />$ 25.00 <br />$ 1,000 00 <br />accommodate new sidwalk, complete in <br />place <br />16 1 LS Concrete Steps, complete in place <br />S 75000 <br />$ 75000 <br />$ 800.00 <br />$ 80000 <br />$ 55000 <br />$ 55000 <br />$ 1,200.00 <br />$ 1,200 00 <br />$ 1,500 00 <br />$ 1,500.00 <br />$ 60000 <br />$ 60000 <br />$ 90000 <br />$ 90000 <br />17 1 LS 15 Linear Feel of 1'High Wall, <br />$ 1,00000 <br />$ 1,00000 <br />$ 300.00 <br />$ 30000 <br />$ 670.00 <br />$ 67000 <br />$ 1,100.00 <br />$ 1,10000 <br />$ 1,60000 <br />S 1,60000 <br />$ 1,10000 <br />$ 1,10000 <br />$ 1 2000 <br />$ 1,20000 <br />complete in place <br />18. 12 LF 24" While Solid Reflectorized <br />S 1000 <br />$ 12000 <br />$ 5.50 <br />$ 6600 <br />$ 35.00 <br />$ 42000 <br />$ 4200 <br />$ 504.00 <br />S 2500 <br />S 30000 <br />$ 200A <br />S 24000 <br />$ 350 <br />$ 420.00 <br />Pavement Marking Type I & II <br />(Thermoplastic), complete in place <br />o \0323WW14t030730 Bi4TabLng xis V Shown Amount (Note Actual Amount Indicated) <br />