<br />BID TABULATION
<br />PROJECT: City of San Marcos Downtown ADA Improvements Project
<br />OWNER: City of San Marcos
<br />JOB NUMBER: 0323 -4 -026
<br />BID DATE: March 2, 2010
<br />PROJECT LOCATION: San Marcos Texas
<br />D. Shaffer Concrete Co. Inc. Austin Calslmclurs, LLC. Prism Development, Inc G &P Contractors Inc. Relmcc Inc. I TCB Cosntruction Inc Myers Concrete Construction LP
<br />Item_ uantt Unit 12g§gription Unit Price Amount Unit Price Amoun Unit Price Amoun Unit Price Amount Unit Price Amou Unit Price Amount Unit Prlco Amoun
<br />1 1 EA Mobilization
<br />$ 2,46130
<br />$ 2,46130
<br />$ 1,80000
<br />$ 1,800.00
<br />$ 5,000.00
<br />$ 5,00000
<br />$ 10,00000
<br />$ 10,000 .00
<br />$ 10,00000
<br />$ 10,00000
<br />$ 6,000.00
<br />$ 6,000.00
<br />$ 4,000.00
<br />$ 4,000.00
<br />2 70 CY Unclassified Excavation (including but
<br />$ 8000
<br />$ 5,600.00
<br />$ 6000
<br />$ 4,200 00
<br />$ 4800
<br />$ 3,360.00
<br />$ 115.00
<br />$ 8,05000
<br />$ 7000
<br />$ 4,900.00
<br />$ 120.00
<br />$ 8,40000
<br />$ 5750
<br />$ 4,025.00
<br />not limited to saw culling and removing
<br />HMAC and concrete, clearing and
<br />grubbing, haul of excess, and
<br />embankment), complete in place
<br />3 138 LF Remove Curb & Gutter, complete ul
<br />$ 500
<br />$ 690.00
<br />$ 1200
<br />$ 1,656.00
<br />$ 725
<br />$ 1,00050
<br />$ 600
<br />$ 82800
<br />$ 600
<br />$ 82800
<br />$ 5.00
<br />$ 690 W
<br />S 20.00
<br />$ 2,76000
<br />Place
<br />4 1,441 SF Remove Concrete Sidwalk and
<br />$ 100
<br />S 1,441.00
<br />$ 600
<br />$ 8,64600
<br />$ 3.75
<br />$ 5,40175
<br />$ 300
<br />$ 4,32300
<br />$ 150
<br />$ 2,16150
<br />$ 2.00
<br />$ 2,882.00
<br />S 3.30
<br />$ 4,755.30
<br />Driveway, complete in place
<br />5. 571 5F Concrete Sidewalk, 4" Thick, Including
<br />$ 500
<br />$ 2.855.00
<br />$ 425
<br />$ 2,42675
<br />$ 3.50
<br />$ 1,99850
<br />$ 425
<br />$ 2,426.75
<br />$ 12,00
<br />$ 6,852.00
<br />$ 600
<br />$ 3,426.00
<br />S 8.60
<br />$ 4,910.60
<br />Excavation and Removal of
<br />Obstructions, complete in place
<br />6 1 FA Side Walk Ramp including truncated
<br />$ 750,00
<br />$ 75000
<br />$ 1,200.00
<br />$ 1,20000
<br />$ 1,00000
<br />$ 1,000.00
<br />$ 850.00
<br />$ 850.00
<br />$ 2,500.00
<br />$ 2,50000
<br />$ 1,20000
<br />$ 1,200.00
<br />$ 1,200.00
<br />$ 1,20000
<br />domes (Parallel to Street), complete in
<br />place
<br />Actual -
<br />7 2 FA Curb [Ramp with Double Flares
<br />$ 75000
<br />$ 1,50000
<br />$ 90000
<br />$ 1,80000
<br />$ 1,20000
<br />$ 2,40000
<br />$ 1,00000
<br />$ 2,000.00
<br />$ 2,350.00
<br />S 4,700,00
<br />$ 1,000.00
<br />$ 2,000.00
<br />$ 1,45000
<br />$ 2,900.00
<br />(including truncated domes), complete
<br />in place
<br />Shown-
<br />$ 1,000.00
<br />8. 3 EA Curb Ramp with Single Flares
<br />$ 75000
<br />$ 2,25000
<br />$ 70000
<br />$ 2,10000
<br />$ 1,10000
<br />$ 3,30000
<br />$ 95000
<br />$ 2,850.00
<br />$ 1,95000
<br />S 5,850,00
<br />$ 900.00
<br />$ 2,700.00
<br />S 1,333.00
<br />$ 3,999.00
<br />(including truncated domes), complete
<br />in place
<br />9 10 FA
<br />$ 75000
<br />$ 7,50000
<br />$ 50900
<br />$ 5,00000
<br />$ 90000
<br />$ 9,00000
<br />$ 90000
<br />$ 9,00000
<br />$ 1,65000
<br />$ 16,50000
<br />$ 90000
<br />$ 9,000.00
<br />$ 1,200.00
<br />$ 12,000.00
<br />Curb Ramp with no Flares (including
<br />truncated domes), complete in place
<br />10. 146 LF Curb & Gutter, complete in place
<br />$ 1000
<br />$ 1.46000
<br />$ 1200
<br />$ 1,752.00
<br />$ 27
<br />$ 4,015.00
<br />$ 15.00
<br />$ 2,190 00
<br />$ 1800
<br />$ 2,628.00
<br />$ 21.00
<br />$ 3,066.00
<br />$ 33.00
<br />$ 4,818.00
<br />11. 17 EA Truncated Domes (including sawcutting
<br />$ 36000
<br />S 5.95000
<br />$ 300.00
<br />$ 5,10000
<br />$ 35000
<br />$ 5.95000
<br />$ 35000
<br />$ 5,95000
<br />S 1,200 00
<br />S 20,400 00
<br />$ 40000
<br />$ 6.80000
<br />$ 69500
<br />$ 11,815 00
<br />existing concrete ramp, hard of excess),
<br />complete in place
<br />12. 1 LS Remove Existing Handrails, complete in
<br />$ 25000
<br />$ 250.00
<br />$ 600.00
<br />$ 600.00
<br />$ 250.00
<br />$ 250.00
<br />$ 35000
<br />$ 350.00
<br />$ 60000
<br />$ 60000
<br />$ 60000
<br />$ 600.00
<br />$ 70000
<br />$ 700.00
<br />place
<br />13 54 LF Handrails, including paint, complete in
<br />$ 5000
<br />$ 2,70000
<br />$ 33.00
<br />$ 1,78200
<br />$ 9600
<br />$ 5,184.00
<br />$ 10500
<br />$ 5,67000
<br />$ 75.00
<br />S 4,05000
<br />S 8500
<br />$ 4,59000
<br />$ 52.00
<br />$ 2,808.00
<br />place
<br />Actual -
<br />14 32 LF Bick Paver Hoarder to match existing,
<br />$ 10000
<br />$ 3,200.00
<br />$ 1600
<br />$ 512.00
<br />$ 860
<br />$ 27520
<br />$ 1600
<br />$ 512.00
<br />$ 40.00
<br />$ 1,280.00
<br />$ 4000
<br />$ 1,280.00
<br />$ 2500
<br />$ 800.00
<br />complete in place
<br />Shown-
<br />$ 27500
<br />15 40 SF Remove and Replace Brick Pavers to
<br />$ 10 00
<br />$ 40000
<br />$ 11.50
<br />$ 460.00
<br />$ 1850
<br />$ 740.00
<br />$ 45.00
<br />$ 1,800.00
<br />$ 2000
<br />$ 800.00
<br />$ 30,00
<br />$ 1.200.00
<br />$ 25.00
<br />$ 1,000 00
<br />accommodate new sidwalk, complete in
<br />place
<br />16 1 LS Concrete Steps, complete in place
<br />S 75000
<br />$ 75000
<br />$ 800.00
<br />$ 80000
<br />$ 55000
<br />$ 55000
<br />$ 1,200.00
<br />$ 1,200 00
<br />$ 1,500 00
<br />$ 1,500.00
<br />$ 60000
<br />$ 60000
<br />$ 90000
<br />$ 90000
<br />17 1 LS 15 Linear Feel of 1'High Wall,
<br />$ 1,00000
<br />$ 1,00000
<br />$ 300.00
<br />$ 30000
<br />$ 670.00
<br />$ 67000
<br />$ 1,100.00
<br />$ 1,10000
<br />$ 1,60000
<br />S 1,60000
<br />$ 1,10000
<br />$ 1,10000
<br />$ 1 2000
<br />$ 1,20000
<br />complete in place
<br />18. 12 LF 24" While Solid Reflectorized
<br />S 1000
<br />$ 12000
<br />$ 5.50
<br />$ 6600
<br />$ 35.00
<br />$ 42000
<br />$ 4200
<br />$ 504.00
<br />S 2500
<br />S 30000
<br />$ 200A
<br />S 24000
<br />$ 350
<br />$ 420.00
<br />Pavement Marking Type I & II
<br />(Thermoplastic), complete in place
<br />o \0323WW14t030730 Bi4TabLng xis V Shown Amount (Note Actual Amount Indicated)