|
•
<br />•
<br />•
<br />PROJECT: City of San Marcos Downtown ADA Improvements Project
<br />OWNER: Cdy of San Maws
<br />JOB NUMBER: 0323-4 -026
<br />BID DATE: March 2, 2010
<br />PROJECT LOCATION: San Marron, Texas
<br />D. Shaffer C Co. Ina Austin Constructors LLC. Prism Development, Inc. G &P Contractors, Inc Relmco Inc TCB Cosntruction Inc Weirs Concret Co nstruction, LP_
<br />Amo in Unit Price Amoun Unit Price Amount Unit Price Amount Unit Price Amount Unit Pr lco Amount Unit Prico Am u
<br />bm Quantity jug Description U i1 Price � n
<br />ALTERNATE BID NO. 2: INCLUDES REMOVING EX. ASPHALT,
<br />INSTALLING
<br />70 LF OF SIDEWALK,
<br />AND REMOVING
<br />EX. WALL
<br />OUT OF CITY R -O
<br />-W
<br />33 30 CY
<br />IS 8000
<br />$ 2,400.00
<br />$ 3800
<br />S 1.14000
<br />5 4800
<br />$ 1.44000
<br />$ 11500
<br />$ 3,45000
<br />$ 5000
<br />$ 1,50000
<br />$ 4000
<br />$ 1,200 00
<br />$ 12000
<br />$ 3.60000
<br />Unclassified Excavation (including but
<br />not limited to removing HMAC and
<br />Concrete Wall, clearing and grubbm,
<br />haul of excess, and embankment)
<br />34 280 SF Concrete Sidewalk, 5" Thick, Including
<br />$ 5.00
<br />$ 1,40000
<br />$ 525
<br />$ 1,47000
<br />$ 375
<br />$ 1,050,00
<br />$ 475
<br />$ 1.33000
<br />$ 12.00
<br />$ 3,360.00
<br />$ 6.00
<br />$ 1.68000
<br />$ 1600
<br />$ 4.48000
<br />Excavation and Removal of
<br />Obstructions, complete in place
<br />35. 164 LF Safety Fence, complete In place
<br />$ 2.00
<br />$ 32800
<br />$ 225
<br />$ 369.00
<br />$ 1 96
<br />$ 321.44
<br />$ 4 DO
<br />$ 65600
<br />$ 500
<br />$ 820.00
<br />$ 3.00
<br />$ 49200
<br />$ 250
<br />$ 410.00
<br />36 1 FA Inlet Protection, complete in place
<br />$ 100.00
<br />$ 10300
<br />S 60 00
<br />$ 60 00
<br />S 65 00
<br />S 65g0
<br />S 95 On
<br />5 95 OD
<br />$ 100 no
<br />R 10000
<br />S 7500
<br />S 7500
<br />$ 20000
<br />$ 20000
<br />37, 1 MO Traffic Controls including Barricades,
<br />$ 3,000.00
<br />$ 3,000.00
<br />$ 9,000.00
<br />$ 9
<br />$ 1,25000
<br />S 1,25000
<br />$ 3,000.00
<br />S 3,000,00
<br />$ 2,500.00
<br />S 2.500.00
<br />$ 1,100.00
<br />S 1,10000
<br />$ 1,000.00
<br />$ 1,00100
<br />signs, and Traffic Handling, complete in
<br />place
<br />$ 7,228.00
<br />$ 12,039.00
<br />8,531.00
<br />$ 8,280.00
<br />$ 4,547.00
<br />$ 9,690.00
<br />TOTAL ALTERNATE BID NO. 2
<br />(Sum of Items 33 -37)
<br />TOTAL BASE BID PLUS ALTERNATE BIDS 1.2
<br />Actual
<br />$ 71,560.30
<br />$ 98,985.00
<br />Actual
<br />$ 76,186.84
<br />Actual
<br />$ 97,380.50
<br />$ 130,224.50
<br />$ 78,927.00
<br />$ 98,173.15
<br />Shown
<br />$ 65,560.30
<br />Shown
<br />$ 76,186.44
<br />Shown
<br />$ 97,360.50
<br />o 10 3 2 314101 4103 0 /3 0- SldTabLng As "S" = Sitown Amount (Note Actual Amount Indicated) 3
<br />
|