City of San Marcos
<br />BID TABS
<br />MCCARTY LANE PHASE II
<br />(THURSDAY, MARCH 4, 2010)
<br />PAGE 11 OF 15
<br />Cash Const.
<br />RGM
<br />Const.
<br />Item No.
<br />Bid Code
<br />DESCRIPTION
<br />UNIT
<br />Quant
<br />Unit Bid
<br />Unit Total
<br />Unit Bid
<br />Unit Total
<br />1
<br />100 -2002
<br />PREPARING ROW
<br />STA
<br />54
<br />$1,900.00
<br />$102,600.00
<br />$4,700.00
<br />$253,800.0
<br />2
<br />106 -2001
<br />OBLITERATING ABANDONED ROAD
<br />STA
<br />46.4
<br />$200.00
<br />$9,280.00
<br />$200.00
<br />$9,280.00
<br />3
<br />110 -2001
<br />EXCAVATION ROADWAY
<br />CY
<br />9709
<br />$2.75
<br />$26,699.75
<br />$9.25
<br />$89,808.25
<br />4
<br />132 -2003
<br />EMBANKMENT FINAL ORD COMP TY B
<br />CY
<br />39514
<br />$8.00
<br />$316,112.00
<br />$12.00
<br />$474,168.0
<br />5
<br />160 -2003
<br />FURNISHING AND PLACING TOPSOIL 4"
<br />SY
<br />71262.4
<br />$1.00
<br />$71,262.40
<br />$0.75
<br />$53,446.80
<br />6
<br />161 -2012
<br />GENERAL USE COMPOST
<br />CY
<br />41.9
<br />$40.00
<br />$1,676.00
<br />$100.00
<br />$4,190.00
<br />7
<br />164 -2039
<br />DRILL SEEDING PERM URBAN CLAY
<br />SY
<br />67779.4
<br />$0.15
<br />$10,166.91
<br />$0.08
<br />$5,422.35
<br />8
<br />164 -2041
<br />DRILL SEEDING TEMP WARM
<br />SY
<br />28319
<br />$0.15
<br />$4,247.85
<br />$0.08
<br />$2,265.52
<br />9
<br />168 -2001
<br />VEGETATIVE WATERING
<br />MG
<br />1133
<br />$10.00
<br />$11,330.00
<br />$17.00
<br />$19,261.00
<br />10
<br />169 -2001
<br />SOIL RETENTION BLANKETS CL 1 TY A
<br />SY
<br />3483
<br />$1.00
<br />$3,483.00
<br />$1.15
<br />$4,005.45
<br />11
<br />170 -2001
<br />IRRIGATION SYSTEM
<br />LS
<br />1
<br />$82,000.00
<br />$82,000.00
<br />$45,000.00
<br />$45,000.00
<br />12192
<br />-2012
<br />MULCH
<br />CY
<br />88.2
<br />$30.00
<br />$2,646.00
<br />$65.00
<br />$5,733.00
<br />13
<br />192 -2016
<br />PLANT BED PREPARATION
<br />SY
<br />1567.2
<br />$7.00
<br />$10,970.40
<br />$14.00
<br />$21,940.8
<br />14
<br />192 -2024
<br />PLANT MATERIAL 30 GAL TREE
<br />EA
<br />207
<br />$225.00
<br />$46,575.00
<br />$175.00
<br />$36,225.00
<br />15
<br />192 -2027
<br />PLANT MATERIAL 100 GAL (TREE)
<br />EA
<br />78
<br />$900.00
<br />$70,200.00
<br />$685.00
<br />$53,430.0
<br />16
<br />192 -2028
<br />PLANT MATERIAL 1 GAL SHRUB
<br />EA
<br />278
<br />$4.00
<br />$1,112.00
<br />$4.50
<br />$1,251.00
<br />17
<br />192 -2031
<br />PLANT MATERIAL 5 GAL SHRUB
<br />EA
<br />674
<br />$15.00
<br />$10,110.00
<br />$14.00
<br />$9,436.00
<br />18
<br />192 -2032
<br />PLANT MATERIAL 10 GAL SHRUB
<br />EA
<br />256
<br />$120.00
<br />$30,720.00
<br />$52.00
<br />$13,312.00
<br />19
<br />193 -2001
<br />PLANT MAINTENANCE
<br />MO
<br />6
<br />$4,000.00
<br />$24,000.00
<br />$900.00
<br />$5,400.00
<br />20
<br />193 -2014
<br />IRRIG SYS OPER AND PAINT (SCH A
<br />MO
<br />6
<br />$300.00
<br />$1,800.00
<br />$200.00
<br />$1,200.00
<br />21
<br />247 -2044
<br />FL BS (CMP IN PLC TY A GR 4 FNAL POS
<br />CY
<br />9310
<br />$22.00
<br />$204,820.00
<br />$24.00
<br />$223,440.00
<br />22260-2016
<br />LIME (HYD, COM, OR QK SLURRY
<br />TON
<br />1209
<br />$143.00
<br />$172,887.00
<br />$124.00
<br />$149,916.0
<br />23260-2027
<br />LIME TRT EXST MATL 8"
<br />SY
<br />37772
<br />$2.00
<br />$75,544.00
<br />$1.65
<br />$62,323.80
<br />24
<br />310 -2005
<br />PRIME COAT MC -30 OR AE-P)
<br />GAL
<br />7556
<br />$4.00
<br />$30,224.00
<br />$3.25
<br />$24,557.00
<br />25
<br />341 -2011
<br />D -GR HMA QCQA TY -B PG64 -22
<br />TON
<br />5292
<br />$70.00
<br />$370,440.00
<br />$55.00
<br />$291,060.0
<br />26
<br />341 -2050
<br />D -GR HMA QCQA TY -C PG70 -22
<br />TON
<br />3527
<br />$75.00
<br />$264,525.00
<br />$60.00
<br />$211,620.0
<br />27400-2006
<br />CUT & RESTORING PAV
<br />SY
<br />149
<br />$40.00
<br />$5,960.00
<br />$100.00
<br />$14,900.00
<br />28
<br />401 -2001
<br />FLOWABLE BACKFILL
<br />CY
<br />28
<br />$100.00
<br />$2,800.00
<br />$115.00
<br />$3,220.00
<br />29402-2001
<br />TRENCH EXCAVATION PROTECTION
<br />LF
<br />476
<br />$0.50
<br />$238.00
<br />$4.50
<br />$2,142.00
<br />30416-2002
<br />DRILL SHAFT 24 IN
<br />LF
<br />19841
<br />$50.00
<br />$99,200.00
<br />$56.00
<br />$111,104.00
<br />31
<br />416 -2029
<br />DRILL SHAFT jRDWY ILL POLE 30 IN
<br />LF
<br />240
<br />$95.00
<br />$22,800.00
<br />$115.00
<br />$27,600.00
<br />32420-2001
<br />CL A CONC MISC
<br />CY
<br />3
<br />$1,500.00
<br />$4,500.00
<br />$1,500.00
<br />$4,500.00
<br />33420-2003
<br />CL C CONC ABUT
<br />CY
<br />65
<br />$700.00
<br />$45,500.00
<br />$800.00
<br />$52,000.00
<br />34
<br />420 -2004
<br />CL C CONC BENT
<br />CY
<br />177.5
<br />$875.00
<br />$155,312.50
<br />$800.00
<br />$142,000.00
<br />35420-2033
<br />CL S CONC APPR SLAB
<br />CY
<br />195.6
<br />$320.00
<br />$62,592.00
<br />$350.00
<br />$68,460.00
<br />36
<br />422 -2001
<br />REINF CONC SLAB
<br />SF
<br />32010
<br />$9.00
<br />$288,090.00
<br />$11.00
<br />$352,110.00
<br />37
<br />423 -2001
<br />RETAINING WALL (MSE)
<br />SF
<br />4820
<br />$40.00
<br />$192,800.00
<br />$40.00
<br />$192,800.00
<br />38425-2016
<br />PRESTR CONC SLAB BEAM 4SB15
<br />LF
<br />326.92
<br />$125.00
<br />$40,865.00
<br />$140.00
<br />$45,768.80
<br />39425-2017
<br />PRESTR CONC SLAB BEAM 5SB15
<br />LF
<br />5884.6
<br />$125.00
<br />$735,575.00
<br />$110.00
<br />$647,306.00
<br />40428-2002
<br />CONC SURF TREAT CLASS II
<br />SY
<br />3483
<br />$3.50
<br />$12,190.50
<br />$1.15
<br />$4,005.45
<br />41
<br />432 -2002
<br />RIPRAP CONC 5IN
<br />CY
<br />14
<br />$270.00
<br />$3,780.00
<br />$450.00
<br />$6,300.00
<br />42432-2040
<br />RIPRAP MOW STRIP )(5 IN
<br />CY
<br />15
<br />$360.00
<br />$5,400.00
<br />$550.00
<br />$8,250.00
<br />43450-2071
<br />RAIL C402
<br />LF
<br />688
<br />$125.00
<br />$86,000.00
<br />$140.00
<br />$96,320.00
<br />44450-2077
<br />RAIL HANDRAIL TY F
<br />LF
<br />680
<br />$85.00
<br />$57,800.00
<br />$82.00
<br />$55,760.00
<br />45454-2005
<br />ARMOR JOINT TH SEAL
<br />LF
<br />322.2
<br />$75.00
<br />$24,165.00
<br />$65.00
<br />$20,943.00
<br />46
<br />462 -2019
<br />CONC BOX CULV 8 FT X 4 FT
<br />LF
<br />228
<br />$250.00
<br />$57,000.00
<br />$220.00
<br />$50,160.00
<br />47
<br />464 -2003
<br />RC PIPE CL III 18 IN
<br />LF
<br />1765
<br />$27.00
<br />$47,655.00
<br />$32.00
<br />$56,480.00
<br />48,464-2005
<br />RC PIPE CL III 24 IN
<br />I RC
<br />LF
<br />1824
<br />$34.00
<br />$62,016.00
<br />$36.00
<br />$65,664.00
<br />491464-2007
<br />PIPE CL 111 30 IN
<br />LF
<br />1211
<br />$43.00
<br />$52,073.00
<br />$42.00
<br />$50,862.00
<br />PAGE 11 OF 15
<br />
|