Laserfiche WebLink
City of San Marcos <br />BID TABS <br />MCCARTY LANE PHASE II <br />(THURSDAY, MARCH 4, 2010) <br />PAGE 11 OF 15 <br />Cash Const. <br />RGM <br />Const. <br />Item No. <br />Bid Code <br />DESCRIPTION <br />UNIT <br />Quant <br />Unit Bid <br />Unit Total <br />Unit Bid <br />Unit Total <br />1 <br />100 -2002 <br />PREPARING ROW <br />STA <br />54 <br />$1,900.00 <br />$102,600.00 <br />$4,700.00 <br />$253,800.0 <br />2 <br />106 -2001 <br />OBLITERATING ABANDONED ROAD <br />STA <br />46.4 <br />$200.00 <br />$9,280.00 <br />$200.00 <br />$9,280.00 <br />3 <br />110 -2001 <br />EXCAVATION ROADWAY <br />CY <br />9709 <br />$2.75 <br />$26,699.75 <br />$9.25 <br />$89,808.25 <br />4 <br />132 -2003 <br />EMBANKMENT FINAL ORD COMP TY B <br />CY <br />39514 <br />$8.00 <br />$316,112.00 <br />$12.00 <br />$474,168.0 <br />5 <br />160 -2003 <br />FURNISHING AND PLACING TOPSOIL 4" <br />SY <br />71262.4 <br />$1.00 <br />$71,262.40 <br />$0.75 <br />$53,446.80 <br />6 <br />161 -2012 <br />GENERAL USE COMPOST <br />CY <br />41.9 <br />$40.00 <br />$1,676.00 <br />$100.00 <br />$4,190.00 <br />7 <br />164 -2039 <br />DRILL SEEDING PERM URBAN CLAY <br />SY <br />67779.4 <br />$0.15 <br />$10,166.91 <br />$0.08 <br />$5,422.35 <br />8 <br />164 -2041 <br />DRILL SEEDING TEMP WARM <br />SY <br />28319 <br />$0.15 <br />$4,247.85 <br />$0.08 <br />$2,265.52 <br />9 <br />168 -2001 <br />VEGETATIVE WATERING <br />MG <br />1133 <br />$10.00 <br />$11,330.00 <br />$17.00 <br />$19,261.00 <br />10 <br />169 -2001 <br />SOIL RETENTION BLANKETS CL 1 TY A <br />SY <br />3483 <br />$1.00 <br />$3,483.00 <br />$1.15 <br />$4,005.45 <br />11 <br />170 -2001 <br />IRRIGATION SYSTEM <br />LS <br />1 <br />$82,000.00 <br />$82,000.00 <br />$45,000.00 <br />$45,000.00 <br />12192 <br />-2012 <br />MULCH <br />CY <br />88.2 <br />$30.00 <br />$2,646.00 <br />$65.00 <br />$5,733.00 <br />13 <br />192 -2016 <br />PLANT BED PREPARATION <br />SY <br />1567.2 <br />$7.00 <br />$10,970.40 <br />$14.00 <br />$21,940.8 <br />14 <br />192 -2024 <br />PLANT MATERIAL 30 GAL TREE <br />EA <br />207 <br />$225.00 <br />$46,575.00 <br />$175.00 <br />$36,225.00 <br />15 <br />192 -2027 <br />PLANT MATERIAL 100 GAL (TREE) <br />EA <br />78 <br />$900.00 <br />$70,200.00 <br />$685.00 <br />$53,430.0 <br />16 <br />192 -2028 <br />PLANT MATERIAL 1 GAL SHRUB <br />EA <br />278 <br />$4.00 <br />$1,112.00 <br />$4.50 <br />$1,251.00 <br />17 <br />192 -2031 <br />PLANT MATERIAL 5 GAL SHRUB <br />EA <br />674 <br />$15.00 <br />$10,110.00 <br />$14.00 <br />$9,436.00 <br />18 <br />192 -2032 <br />PLANT MATERIAL 10 GAL SHRUB <br />EA <br />256 <br />$120.00 <br />$30,720.00 <br />$52.00 <br />$13,312.00 <br />19 <br />193 -2001 <br />PLANT MAINTENANCE <br />MO <br />6 <br />$4,000.00 <br />$24,000.00 <br />$900.00 <br />$5,400.00 <br />20 <br />193 -2014 <br />IRRIG SYS OPER AND PAINT (SCH A <br />MO <br />6 <br />$300.00 <br />$1,800.00 <br />$200.00 <br />$1,200.00 <br />21 <br />247 -2044 <br />FL BS (CMP IN PLC TY A GR 4 FNAL POS <br />CY <br />9310 <br />$22.00 <br />$204,820.00 <br />$24.00 <br />$223,440.00 <br />22260-2016 <br />LIME (HYD, COM, OR QK SLURRY <br />TON <br />1209 <br />$143.00 <br />$172,887.00 <br />$124.00 <br />$149,916.0 <br />23260-2027 <br />LIME TRT EXST MATL 8" <br />SY <br />37772 <br />$2.00 <br />$75,544.00 <br />$1.65 <br />$62,323.80 <br />24 <br />310 -2005 <br />PRIME COAT MC -30 OR AE-P) <br />GAL <br />7556 <br />$4.00 <br />$30,224.00 <br />$3.25 <br />$24,557.00 <br />25 <br />341 -2011 <br />D -GR HMA QCQA TY -B PG64 -22 <br />TON <br />5292 <br />$70.00 <br />$370,440.00 <br />$55.00 <br />$291,060.0 <br />26 <br />341 -2050 <br />D -GR HMA QCQA TY -C PG70 -22 <br />TON <br />3527 <br />$75.00 <br />$264,525.00 <br />$60.00 <br />$211,620.0 <br />27400-2006 <br />CUT & RESTORING PAV <br />SY <br />149 <br />$40.00 <br />$5,960.00 <br />$100.00 <br />$14,900.00 <br />28 <br />401 -2001 <br />FLOWABLE BACKFILL <br />CY <br />28 <br />$100.00 <br />$2,800.00 <br />$115.00 <br />$3,220.00 <br />29402-2001 <br />TRENCH EXCAVATION PROTECTION <br />LF <br />476 <br />$0.50 <br />$238.00 <br />$4.50 <br />$2,142.00 <br />30416-2002 <br />DRILL SHAFT 24 IN <br />LF <br />19841 <br />$50.00 <br />$99,200.00 <br />$56.00 <br />$111,104.00 <br />31 <br />416 -2029 <br />DRILL SHAFT jRDWY ILL POLE 30 IN <br />LF <br />240 <br />$95.00 <br />$22,800.00 <br />$115.00 <br />$27,600.00 <br />32420-2001 <br />CL A CONC MISC <br />CY <br />3 <br />$1,500.00 <br />$4,500.00 <br />$1,500.00 <br />$4,500.00 <br />33420-2003 <br />CL C CONC ABUT <br />CY <br />65 <br />$700.00 <br />$45,500.00 <br />$800.00 <br />$52,000.00 <br />34 <br />420 -2004 <br />CL C CONC BENT <br />CY <br />177.5 <br />$875.00 <br />$155,312.50 <br />$800.00 <br />$142,000.00 <br />35420-2033 <br />CL S CONC APPR SLAB <br />CY <br />195.6 <br />$320.00 <br />$62,592.00 <br />$350.00 <br />$68,460.00 <br />36 <br />422 -2001 <br />REINF CONC SLAB <br />SF <br />32010 <br />$9.00 <br />$288,090.00 <br />$11.00 <br />$352,110.00 <br />37 <br />423 -2001 <br />RETAINING WALL (MSE) <br />SF <br />4820 <br />$40.00 <br />$192,800.00 <br />$40.00 <br />$192,800.00 <br />38425-2016 <br />PRESTR CONC SLAB BEAM 4SB15 <br />LF <br />326.92 <br />$125.00 <br />$40,865.00 <br />$140.00 <br />$45,768.80 <br />39425-2017 <br />PRESTR CONC SLAB BEAM 5SB15 <br />LF <br />5884.6 <br />$125.00 <br />$735,575.00 <br />$110.00 <br />$647,306.00 <br />40428-2002 <br />CONC SURF TREAT CLASS II <br />SY <br />3483 <br />$3.50 <br />$12,190.50 <br />$1.15 <br />$4,005.45 <br />41 <br />432 -2002 <br />RIPRAP CONC 5IN <br />CY <br />14 <br />$270.00 <br />$3,780.00 <br />$450.00 <br />$6,300.00 <br />42432-2040 <br />RIPRAP MOW STRIP )(5 IN <br />CY <br />15 <br />$360.00 <br />$5,400.00 <br />$550.00 <br />$8,250.00 <br />43450-2071 <br />RAIL C402 <br />LF <br />688 <br />$125.00 <br />$86,000.00 <br />$140.00 <br />$96,320.00 <br />44450-2077 <br />RAIL HANDRAIL TY F <br />LF <br />680 <br />$85.00 <br />$57,800.00 <br />$82.00 <br />$55,760.00 <br />45454-2005 <br />ARMOR JOINT TH SEAL <br />LF <br />322.2 <br />$75.00 <br />$24,165.00 <br />$65.00 <br />$20,943.00 <br />46 <br />462 -2019 <br />CONC BOX CULV 8 FT X 4 FT <br />LF <br />228 <br />$250.00 <br />$57,000.00 <br />$220.00 <br />$50,160.00 <br />47 <br />464 -2003 <br />RC PIPE CL III 18 IN <br />LF <br />1765 <br />$27.00 <br />$47,655.00 <br />$32.00 <br />$56,480.00 <br />48,464-2005 <br />RC PIPE CL III 24 IN <br />I RC <br />LF <br />1824 <br />$34.00 <br />$62,016.00 <br />$36.00 <br />$65,664.00 <br />491464-2007 <br />PIPE CL 111 30 IN <br />LF <br />1211 <br />$43.00 <br />$52,073.00 <br />$42.00 <br />$50,862.00 <br />PAGE 11 OF 15 <br />