My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2010-050
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2010
>
Res 2010-050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2010 9:36:53 AM
Creation date
3/30/2010 8:05:06 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Construction Contract
Number
2010-50
Date
3/23/2010
Volume Book
185
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I 505 EAST Hunm1,AND DRIVE, SUITE 100 <br />KBR III AUSTIN, TExAs 78752 <br />TES,. (512) 420 -0338 FAX. (512) 419 -1432 <br />Bid and reference review for Texas Sterling Construction Company. <br />Required documentation included with bid proposal: <br />• Acknowledgements <br />o All three required were made, Addendums, Bid Bond, and SBQ (See Appendix B) <br />• Statement of Bidder's Qualifications <br />• Included and reviewed. Information appears to be accurate and complete, and no serious issues were <br />detected. <br />• Reviewed financial statement. Contractor's financial abilities appear to be adequate for the project. <br />Note that between the time of review, start of construction and completion of construction financial <br />elements may change. Based on the contractor being able to procure bonding for the project, this <br />confirms that the contractor is financially capable of beginning the work. <br />• Contacted sampling of references (See Appendix C), Both owners and engineers representing projects <br />appear to recommend the contractors ability to construct quality projects. All contacted, that <br />responded, would recommend them to work on additional. <br />• Bid <br />• Bid included in the format supplied by the City and Engineer. Bid was reviewed, summarized and <br />compared to the competing bids. (See Appendix D) <br />• Bid was not mathematically or materially unbalanced. Mathematically unbalanced bids contain bid <br />prices that do not reflect reasonable actual costs plus reasonable share of the bidder's anticipated profit, <br />overhead and other indirect costs. Materially unbalanced bids are bids that generate reasonable doubt <br />that award to the bidder submitting the bid will result in the lowest ultimate cost to the City. <br />• <br />• Line item subtotals matched unit bid price multiplied by quantity. <br />• Bid was signed <br />o Bid bond was confirmed as a valid bid bond <br />0 file: L:\ Highway\ SNM_AT411_MCRTY1Constmction\Bid Tabs \Recommendation.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.